Some thoughts regarding prototype installation tests of gas-insulated HVDC systems

机译:关于气体绝缘HVDC系统原型安装试验的一些思考

获取原文

摘要

Based on service experience, gas-insulated HVAC systems feature a high degree of reliability and excellent long-term performance. This applies for gas-insulated switchgear (GIS) as well as for gas-insulated lines (GIL). Users intending to employ gas-insulated HVDC systems expect the same reliability and long-term performance. This leads to the question of the necessity of long-term tests on gas-insulated HVDC systems in general and to the formulation of relevant test procedures if applicable. The test mainly closes the lack of experience with the new HVDC technology under real service conditions. The test will be called "prototype installation test" to express the idea that this test should be carried out for collecting more experience with this kind of DC technology. The main part consists of a long-term test at DC voltage under high load conditions followed by a test with superimposed LI and SI voltage waveforms. A test duration in correspondence with practical load cycles of 30 days is suggested. The test at high load requires a current injection of the rated current into the HV circuit. AC as well as DC current heating is discussed. The test procedure for superimposed voltage testing in general and the testing with superimposed oscillating voltage in particular is presented. The oscillating impulse voltage is especially required in case of long test assemblies like GIL. Based on these considerations a prototype installation test procedure is recommended, which can prove the long-term capability of gas-insulated HVDC systems. This proposal is also under discussion in JWG D1/B3.57.
机译:基于服务经验,气体绝缘的HVAC系统具有高度可靠性和优异的长期性能。这适用于气体绝缘开关设备(GIS)以及气体绝缘线(GIL)。打算使用气体绝缘HVDC系统的用户期望相同的可靠性和长期性能。这导致了一般的气体绝缘HVDC系统的长期试验的必要性,并在适用的情况下制定相关的测试程序。该测试主要在实际服务条件下关闭了新的HVDC技术缺乏经验。该测试将被称为“原型安装测试”,以表达应对此测试的想法进行,以便收集更多使用这种直流技术的经验。主要部分包括在高负荷条件下在直流电压下进行长期测试,然后用叠加的LI和Si电压波形进行测试。建议与实际负载循环相对应的测试持续时间为30天。高负荷测试需要将额定电流的电流注入HV电路。讨论交流以及DC电流加热。呈现了一般叠加电压测试的测试程序,特别是用叠加的振荡电压进行测试。在像GIL这样的长测试组件的情况下,特别需要振动脉冲电压。根据这些考虑,建议使用原型安装测试程序,这可以证明气体绝缘HVDC系统的长期能力。该提案还在JWG D1 / B3.57中讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号