首页> 外文会议>SPE Latin America and Caribbean Mature Fields Symposium >A Challenging Workover in an Offshore Fixed Platform - Accessing Bypassed Hydrocarbons
【24h】

A Challenging Workover in an Offshore Fixed Platform - Accessing Bypassed Hydrocarbons

机译:在海上固定平台上有挑战性的工作组 - 访问旁路碳氢化合物

获取原文

摘要

This paper presents the planning, execution, and lessons learned of a challenging workover focused on accessing bypassed hydrocarbons for production increase. The workover goal was to add two-bypassed zones, a high quality upper carbonate zone and a thin bed of sandstone, both above the production casing shoe, to the openhole carbonate production of a horizontal well in a fixed offshore platform. Polvo is a brown or mature field in shallow waters of Campos Basin, Brazil. Among the typical problems of mature fields, Polvo shows only pressure drop, declining oil rate, and high water influx, with 80% average water cut. To extend the economic life of Polvo, a huge challenge in the current downturn, its independent operator is rejuvenating existing producing wells, optimizing flow, and identifying, quantifying and accessing bypassed hydrocarbons. The original well was completed in a lower carbonate zone in a 604 m openhole lateral section with sand control screens. After reviewing reservoir and well data, the operator team found the two mentioned bypassed zones. In order to access these zones, it was necessary to perforate them, to control sand production in the sandstone, and to deploy an intermediate completion. Because of internal diameter restriction in the lower completion, hydrajetting replaced casing gun operations in both zones. Sand control in the high angle sandstone interval was a challenge. A specific fracturing/gravel operation followed, successfully, a failed sandstone consolidation trial. Among the main challenges this workover faced budget and time limitations, once the rig operated on a temporary contract, and material, equipment, and footprint restrictions, not mentioning lack of relevant information about the bypassed sandstone zone.
机译:本文提出了一项挑战性的工作组的规划,执行和经验教训,专注于进入旁路碳氢化合物以进行生产增加。该工作组目标是加入双旁路区域,高质量的上碳酸盐区和一层薄薄的砂岩床,在生产套管上方,在固定的海上平台中露天碳酸盐生产水平井。 Polvo是巴西坎多斯盆地浅水区的棕色或成熟的田野。在成熟田地的典型问题中,POLVO仅显示压降,油速下降和高水分流入,平均水平降低了80%。为了扩大Polvo的经济生活,其独立的运营商在目前的经济衰退中挑战了巨大的挑战,正在恢复现有的生产井,优化流动,识别,量化和进入旁路碳氢化合物。原始井在604M Openhole横向截面中​​的较低碳酸盐区中完成,其中砂对照屏幕。在审查水库和井数据后,运营商团队发现了两个提到的旁路区域。为了进入这些区域,有必要穿孔,以控制砂岩中的砂生产,并展开中间完成。由于较低完成的内径限制,湿法在两个区域中更换了套管枪操作。高角度砂岩间隔中的砂控制是一个挑战。遵循特定的压裂/砾石操作,成功,砂岩固结试验失败。在这一工作台面临预算和时间限制的主要挑战中,一旦钻机在临时合同和材料,设备和足迹限制,没有提到缺乏有关旁路砂岩区的相关信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号