Rock Grouting In Copenhagen Limestone-The Cityringen Experience

机译:哥本哈根石灰石的岩石灌浆 - 欧洲关销经验

获取原文

摘要

Extensive rock grouting has been carried out during the construction phase of the Cityringen Metro Project. The main goal of the rock grouting has been to reduce the permeability in the rock by filling joints, cracks and fissures, in order to minimize the groundwater inflow during excavation of caverns, pump sumps and TBM break in/out through the stations/shafts. Both horizontal and vertical grouting has been performed above and below the water table, with unique challenges and advantages/disadvantages. The grouting has been performed as up-stage, where the grout hole is drilled to full depth and then grouted from the bottom and up in stages using a pneumatic packer. The split-spacing method has been used to expand the grouting pattern if needed after primary grouting campaign has been finished and tested. The article describes, through case histories, the achieved results, challenges and limits of the applied methods, including future recommendations. The rock characteristics of the Copenhagen limestone, in regards to the performed rock grouting, are also discussed.
机译:在Cityringen Metro项目的建设阶段,已经进行了广泛的岩石灌浆。通过填充接头,裂缝和裂缝,岩石灌浆的主要目标是通过填充接头,裂缝和裂缝来减少岩石中的渗透性,以便通过站/轴挖掘洞穴,泵槽和TBM断开/输出的地下水流入。水平和垂直灌浆的两者都在水表上方和下方进行,具有独特的挑战和优点/缺点。灌浆已经进行了最新的阶段,其中灌浆孔钻到全深度,然后使用气动封隔器从底部和阶段从底部灌浆。如果完成初级灌浆运动完成并测试后,分别间隔方法已被用于扩展灌浆模式。本文通过案例历史,实现的结果,挑战和限制,包括未来的建议。还讨论了哥本哈根石灰石的岩石特征,关于进行的岩石灌浆。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号