首页> 外文会议>International Symposium on Submerged Floating Tunnels and Underwater Tunnel Structures >Research on the Uplift Bearing Capacity of Suction Caisson Foundation under Local Tensile Failure
【24h】

Research on the Uplift Bearing Capacity of Suction Caisson Foundation under Local Tensile Failure

机译:局部拉伸衰竭下吸盘基础隆起承载力研究

获取原文

摘要

The research on the uplift bearing capacity is one of the important issues worth concerning and solving. For this reason a lot of studies about this aspect have been done by many scholars, but there are still no wide spread engineering specifications on design and calculation of uplift bearing capacity for suction caisson foundation. The quantitative calculation method on the uplift bearing capacity of suction caisson foundation under local tensile failure is proposed by the author. And the indoor uplift tests are carried out on the single-bucket suction caisson foundation models with different diameters and length-diameter ratios in the wet sand, by which the feasibility of this method is initially proved.
机译:对隆起承载力的研究是值得和解决的重要问题之一。因此,许多学者所做的很多关于这方面的研究,但仍然没有广泛的展开工程规范,用于吸入沉箱基础的隆起承载力的设计和计算。作者提出了局部拉力下载沉积箱基础隆起承载力的定量计算方法。室内隆起测试在湿砂中具有不同直径和长度直径比的单桶吸入沉箱基础模型进行,最初证明了这种方法的可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号