首页> 外文会议>SPE Russian Petroleum Technology Conference >Integrated Asset Modelling and Automated Workflows from Pre-Production to Full Field Development Stage for a Giant Green Field West Qurna-2
【24h】

Integrated Asset Modelling and Automated Workflows from Pre-Production to Full Field Development Stage for a Giant Green Field West Qurna-2

机译:综合资产建模和自动化工作流程从生产预生产到全场开发阶段为巨型绿地西部Qurna-2

获取原文

摘要

The West Qurna-2 field is one of the biggest undeveloped oil fields in Iraq. The development of the field is handled by the Iraqi Basra Oil Company and a consortium between LUKOIL and the National Iraqi North Oil Company. The production of the field started in 2014. This paper describes how the integrated asset model (IAM) and automated workflows have been used to support the field's development from first oil to full field development. Along the field's development stages, the IAM system has assisted LUKOIL in its operations. Its availability for first oil allowed refining the assumptions made about the productivity of the wells and reservoir characteristics for issuing realistic production profiles, hence playing a crucial role in achieving the production's targets. Subsequently, the wells have been gradually converted to artificial lift (electrical submersible pumps) and the IAM system has allowed for extension of the natural flowing mode of the wells, optimization of workover operations, short term optimization of the ESP operations and extension of their lifetime. Today, the IAM system allows for mitigating the water handling constraints through tailor-made field- wide optimization algorithms. The latter optimizes not only the field operations through integrated asset planning but also the water production and injection system continuously. Overall, the IAM system has proven to be instrumental for the development and optimisation of West Qurna II. It has allowed to de-risk the initial production, optimize the workovers in the field, enhance the ESP performance and lifetime, optimize the pressure maintenance systems, etc. It has also provided a platform to empower multi-disciplinary teams. The saving figures presented in this paper alone amount to around 7 million dollars in 2015-2016 and it is not unreasonable to ultimately expect total savings of tens of million dollars. Such savings make the implementation of IAM systems very attractive for similar green field operations. LUKOIL has made critical choices for ensuring the success of the initiative, such as allowing for customization and flexibility of its IAM system, putting the necessary efforts in developing and maintaining accurate hydraulic models and starting simple and keeping focusing on the continuous and organic development and improvement of its IAM system.This paper demonstrates how IAM systems can be practically used for optimization activities in a green field, and the associated direct benefits. It also details how to maintain such systems continuously up to date for a field in development phase, where the layout is continuously changing. A series of best practices are identified for ensuring successful embedment of these advanced approaches within the day-to-day operations.
机译:西Qurna-2领域是伊拉克最大的未开发油田之一。该领域的开发由伊拉克斯拉石油公司和卢克石油和国家伊拉克北石油公司之间的联盟处理。该领域的生产于2014年开始。本文介绍了综合资产模型(IAM)和自动化工作流程如何用于支持该领域从第一石油到全场开发的发展。沿着该领域的发展阶段,IAM系统在其运营中辅助卢布。它的第一石油可用性允许精制关于井和储层特征的生产率所取得的假设,以发布现实生产型材,从而在实现生产的目标方面发挥至关重要的作用。随后,井已经逐渐转换为人工升降机(电潜水泵),IAM系统允许延长井的自然流动模式,优化工作台运营,短期优化ESP运营和延伸的延长。如今,IAM系统允许通过量身定制的现场优化算法来缓解水处理限制。后者不仅通过集成资产规划优化了现场操作,而且还优化了水生产和注射系统。总的来说,IAM系统已被证明是西Qurna II的开发和优化的工具。它已允许防范初始生产,优化现场的讨论,提高ESP性能和寿命,优化压力维护系统等。它还为赋予多学科团队提供了一个平台。本文在2015 - 2016年的储蓄数据中展示了大约700万美元,最终预计每百万美元的总储蓄并不合理。此类储蓄使IAM系统的实施非常有吸引力,对类似的绿地操作。卢库洛做出了关键的选择,以确保倡议的成功,例如允许其IAM系统的定制和灵活性,为开发和维护准确的液压模型进行必要的努力,并启动简单,保持着关注不断和有机的发展和改进它的IAM系统。本文演示了IAM系统如何实际上用于绿地中的优化活动,以及相关的直接福利。它还详细介绍了如何在开发阶段的字段中连续地保持此类系统,其中布局连续变化。确定了一系列最佳实践,以确保在日常运营中成功嵌入这些高级方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号