Flam Valley TMF Pond,40 Years of Activity and Still Going

机译:Flam Valley TMF池塘,40年的活动,还在

获取原文

摘要

Flam Valley is a bauxite residue Tailings Management Facility (TMF) valley pond,operating since 1971,located in Romania,just a few meters away from the Danube Delta protected area.Since then,it has been serving Alum Tulcea alumina producing plant through the different stages of its development.Conceived as a frontal tailings dam,Flam Valley is located in a nonpermanent torrential stream in a very sensitive environmental protected area.Up to 2006 tailings slurry with 15-20% solids were pumped by pipeline in the TMF,in accordance with the old technology.After the EU directives enforcement in 2005 the plant had to stop all activity until the whole process was upgraded,consequently the TMF was upgraded with the structural frontal dam being reinforced,water diversions constructed,some areas of the residual storage area were ecologically restored and the deposition became a dry stacking process by tailing placement,thus transforming it into a new TMF and avoiding the consequences that would have derived from the relocation of the TMF.The presented aspects are aimed at generally portraying the evolution,incidents,the tailing dam behavior and prospects of capacity enlargement for Flam Valley TMF.
机译:Flam Valley是一种铝土矿残留尾矿管理设施(TMF)谷池塘,自1971年以来,位于罗马尼亚,距离多瑙河三角洲保护区仅有几米之遥.Since,它一直在为明矾杜马纳氧化铝生产植物的不同之处它的发展阶段。作为额定尾矿大坝的职位,Flam Valley位于一个非常敏感的环境保护区域中的一个非洲暴徒流中。根据TMF的管道泵送15-20%固体的尾矿浆料中的2006颗尾矿浆料。凭借旧技术。在2005年欧盟指令执法后,该工厂必须停止所有活动,直到整个过程升级,因此TMF通过增强的结构正面大坝升级,建造的剩余存储区的一些区域通过生态恢复,并且沉积通过拖尾的放置成为干燥的堆叠过程,从而将其转化为新的TMF并避免会产生的后果衍生自TMF的搬迁。所提出的方面旨在普遍描绘进化,事件,尾矿坝行为和强大山谷TMF容量扩大的前景。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号