首页> 外文会议>SPE/IATMI Asia Pacific Oil Gas Conference and Exhibition >How to Revive Mature Oilfield Production from Surface Aspect, Case Study: Venting System to Gas Scrubber Project in XBU Fields
【24h】

How to Revive Mature Oilfield Production from Surface Aspect, Case Study: Venting System to Gas Scrubber Project in XBU Fields

机译:如何从表面方面复活成熟的油田生产,案例研究:在XBU字段中通风系统到天然气洗涤器项目

获取原文

摘要

XBU is an offshore mature oil fields area which has been produced more than 40 years. There are three fields as main producers from this area; they are CC, RR, and WW. Reservoir pressure in the main reservoirs were originally more than 1700 psi, and by the time it was decreasing to 300 - 500 psi, so many wells in XBU could not be produced due to gas problem and low influx. In the well which had reservoir pressure below bubble point, in every drawdown of ESP, the gas would release in fill the column of annulus in the wellbore. If the casing pressure is close or flow to the system riser pressure of the platform, the column of gas would push the fluid level in the wellbore and make problem of the pump (gas lock, pump off, slug flow, etc). Production operation and engineers then came up with a solution of modification in the surface production facilities by installing venting system through scrubber in the platform which has gas problem wells. By venting the casing pressure to the scrubber and vented to the atmosphere, the production of each well was stable and ESP runlife was longer. This equipment also needs to pass QHSE requirement since almost all of them were located in the unmanned platform. Preliminary study of this project came from several finding of gas problem in almost all XBU wells. Short ESP Runlife also caused by this problem. Design of venting system though scrubber was created by the team with some constrain and must meet safety and technical requirement. Installations of the design were widely applied in year 2008 to 2009. The basic principle of this technology was to make fluid column in the casing as big as possible, so the maximum fluid level can be drawdown by ESP. It can be indicated by having casing pressure as low as possible and increasing flowing bottomhole pressure. This method proved can maintain the decline rate of XBU oil production from 2008 to 2017. Better ESP runlife for problem wells due to gas also can be a parameter of the venting installation success. NWA B-07 and SWW A-03 wells which previously shut in and could not be produced due to categorized as gassy well were an example for proving the methods, those well can be back online after installing venting system through scrubber. This paper will elaborate the general problem of offshore mature oil fields both sandstone and limestone, especially the depleted reservoir which has gas problem. Installing gas venting system through scrubber proved can maintain oil production for about 10 years and even more.
机译:XBU是一个近海成熟的油田,已经生产了40多年。来自该地区的主要生产商有三个领域;它们是CC,RR和WW。主储层中的储层压力最初是超过1700 psi,并且随着速度下降到300-100psi,因此由于气体问题和低涌入而无法产生XBU的许多孔。在具有水库压力的泡沫点下方的井中,在每次缩小的eSP中,气体将释放填充井筒中的环柱。如果套管压力是闭合或流向平台的系统立管压力,则气体柱将推动井筒中的流体水平并使泵(气体锁,泵送,块状物流等)发出问题。生产操作和工程师随后通过在平台上通过洗涤器安装通风系统来提出表面生产设施的修改解决方案,该平台具有煤气问题井。通过向洗涤器通风并排放到大气中的壳体压力,每个孔的产生稳定,ESP运行生物更长。此设备还需要通过QHSE要求,因为几乎所有所有人都位于无人驾驶平台。对这个项目的初步研究来自几乎所有XBU井中的气体问题。短ESP运行生涯也由此问题引起。排气系统设计虽然洗涤器由团队创建,但有一些约束,必须满足安全和技术要求。该设计的装置在2008年至2009年广泛应用。该技术的基本原理是尽可能大的套管中的流体柱,因此最大的流体水平可以通过ESP缩减。通过使壳体压力尽可能低,可以提高流动的底孔压力来表示。此方法证明,可以维持2008年至2017年XBU石油产量的下降率。由于天然气的问题井的更好的ESP运行生物也可以是通风安装成功的参数。 NWA B-07和SWW A-03井之前,由于Gassy井被分类为Gassy井无法生产,因此是用于证明方法的示例,在通过洗涤器安装通风系统后,这些井可以在线返回。本文将详细阐述海上成熟油田砂岩和石灰石的一般问题,尤其是具有煤气问题的耗尽水库。通过洗涤器安装气体通风系统证明可以维持石油生产约10年甚至更多。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号