首页> 外文会议>SPE/IATMI Asia Pacific Oil Gas Conference and Exhibition >Accelerated Depreciation Increase the Economical of PSC Contractors Project in Indonesia
【24h】

Accelerated Depreciation Increase the Economical of PSC Contractors Project in Indonesia

机译:加速折旧增加了印度尼西亚的PSC承包商项目的经济学

获取原文

摘要

The drop in oil prices during last 2 years caused many oil and gas projects in global to be delayed, and even canceled, because the project was considered uneconomical to run under the current low oil price conditions. The postponement also happen in Indonesia and seem to increase the deficit between the total oil and gas production and total oil and gas consumption in the coming period. To overcome this situation, incentives should be given by Government of Indonesia immediately to increase the projects economics. The process of granting incentives, if possible, should not reduce state revenues. Using scenario analysis, this study finds that accelerate depreciation method does not have a big influence to economics of POD/POFDs when the POD/POFDs have high investment. When the investment to POD/POFDs was not too high, the accelerate depreciation will accelerate the investment return that eventually will increase the IRR and NPV values.
机译:过去2年来油价下降导致全球延迟延迟的石油和天然气项目,甚至取消,因为该项目被认为不经常在目前的低油价条件下运行。推迟也发生在印度尼西亚,似乎在未来期间增加石油总产量和油气总产量和油气消耗之间的赤字。为了克服这种情况,印度尼西亚政府应立即给予激励措施,以增加项目经济学。如果可能的话,授予激励措施的过程不应减少国家收入。使用场景分析,本研究发现,当POD / POFD具有高投资时,加速折旧方法对POD / POFD的经济性没有大量影响。当投资到POD / POFDS并不太高时,加速折旧将加速投资回报,最终将增加IRR和NPV值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号