1. Existing fire protection systems, where properly maintained, are acceptable for continued operation. 2. Many USACE powerhouse fire protection systems are currently being upgraded and/or replaced through construction contracts. 3. DoD powerhouse fire protection criteria was revised to clarify baseline requirements, broaden fire protection system types, and enhance power plant personnel safety. 4. Since USACE and A/E firms utilize the same fire protection design criteria the criteria clarifications will provide consistency in the equipment installed in USACE plants. 5. HDC will continue to suggest hydroelectric facility criteria changes to USACE Headquarters based upon research, construction lessons learned, and relevant industry changes. 6. HDC is in the process of modeling four different existing hydroelectric facilities for both overall modernization and the removal of generator fire protection systems. Each facility will have a new Fire Protection Design Analysis and Life Safety Plan for each facility which will be used to understand, detail, and evaluate future modifications.
机译:1.在适当维护的现有防火系统可接受继续运行。 2.许多USACE Powerhouse防火系统目前正在升级和/或通过施工合同替换。修订了Dod Powerhouse Fire Protection标准,以澄清基线要求,扩大防火系统类型,增强电厂人员安全性。 4.由于USACE和A / E公司利用相同的防火设计标准,标准澄清将在USACE工厂中安装的设备提供一致性。 5. HDC将继续建议基于研究,建设教训和相关行业变化的武装总部的水电设施标准变更。 6. HDC是在建模四种不同现有的水力发电机设施,以实现整体现代化和消除发电机防火系统。每个设施将为每个设施具有新的防火设计分析和生命安全计划,用于理解,细节和评估未来的修改。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号