首页> 外文会议>Building Up Efficient and Sustainable Transport Infrastructure >Utilization of BIM for automation of quantity takeoffs and cost estimation in transport infrastructure construction projects in the Czech Republic
【24h】

Utilization of BIM for automation of quantity takeoffs and cost estimation in transport infrastructure construction projects in the Czech Republic

机译:捷克共和国运输基础设施建设项目数量起飞和成本估算的自动化利用

获取原文

摘要

The article deals with problematic parts of automated processing of quantity takeoff (QTO) from data generated in BIM model. It focuses on models of road constructions, and uses volumes and dimensions of excavation work to create an estimate of construction costs. The article uses a case study and explorative methods to discuss possibilities and problems of data transfer from a model to a price system of construction production when such transfer is used for price estimates of construction works. Current QTOs and price tenders are made with 2D documents. This process is becoming obsolete because more modern tools can be used. The BIM phenomenon enables partial automation in processing volumes and dimensions of construction units and matching the data to units in a given price scheme. Therefore price of construction can be estimated and structured without lengthy and often imprecise manual calculations. The use of BIM for QTO is highly dependent on local market budgeting systems, therefore proper push/pull strategy is required. It also requires proper requirements specification, compatible pricing database and software.
机译:本文涉及来自BIM模型中生成的数据的数量起飞(QTO)的自动处理的问题。它侧重于道路结构的模型,并使用挖掘工作的卷和尺寸来创造施工成本的估计。本文使用案例研究和探索方法讨论从模型到施工生产价格体系的数据转移的可能性和问题,当这些转移用于建筑工程的价格估算时。目前的QTO和价格招标是用2D文件制作的。这个过程正在变得过时,因为可以使用更多现代工具。 BIM现象使得部分自动化在处理施工单元的卷和尺寸中,并将数据与特定价格方案中的单位匹配。因此,可以估计和结构的结构价格而无需冗长,并且通常是手动计算的。 BIM用于QTO的使用高度依赖于当地市场预算系统,因此需要适当的推/拉策略。它还需要适当的要求规范,兼容定价数据库和软件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号