首页> 外文会议>International Conference on Recent Advances in Rock Engineering >Prediction, interpretation and treatment of shear zones: A case study of an underground powerhouse cavern
【24h】

Prediction, interpretation and treatment of shear zones: A case study of an underground powerhouse cavern

机译:剪力区的预测,解释和治疗:地下功劳洞穴的案例研究

获取原文

摘要

The state-of-art technical developments in the engineering construction technology has made it now possible to implement any hydro power project, irrespective of its magnitude, wherein even geological setup of project is unfavorable & adverse. However, this poses immense challenge for the rightful selection of a suitable site for execution of huge underground excavation specifically in the heterogeneous rock conditions of Himalayan geology. The necessity of completion of project within the deadlines warrants the thorough geotechnical investigations to be conducted for avoiding geological surprise to the extent possible during the construction stage. Even detailed geological exploration carried out during investigation and pre-construction stage may not rule out presence of adverse geological features, as a fact of life. Underground power house cavern of Punatsangchhu-I H. E. Project encountered a major shear zone running across both the walls of the power house. This shear zone material was heterogeneous in nature and lost its strength in the presence of water. Managing such adverse geological feature often requires support of analytical approaches. Therefore, analytical analysis of power house cavern was carried out and shear zone treatment was evolved. Treatment included excavation of shear zone material up to a certain depth, plugging, rock bolting and shotcreting. This paper presents its prediction, interpretation & design aspects of power house cavern and methodology undertaken to treat the shear zone.
机译:工程施工技术的最先进的技术开发现在可以实现任何水力电力项目,而不管其幅度如何,那么甚至项目的地质设置是不利和不利的。然而,这为合适的选择适合在喜马拉雅地质的异构岩石条件下执行了巨大的地下挖掘,这造成了巨大的挑战。在截止日期内完成项目的必要性需要彻底的岩土性调查,以避免在施工阶段的可能程度上避免地质惊喜。即使在调查和预施工期间开展的详细地质勘探也可能不会排除存在不利地质特征的存在,作为生命的事实。 Punatsangchhu-I H. E. E.项目的地下功率屋洞穴遇到了一座横跨电力房屋墙壁的主要剪切区。这种剪切区的材料本质上是异质的,并且在水存在下失去了强度。管理此类不利地质特征通常需要支持分析方法。因此,进行了动力屋洞穴的分析分析,并进化了剪切区处理。处理包括剪切区材料的挖掘,直到一定的深度,堵塞,岩石螺栓连接和喷射。本文介绍了电力房洞穴和治疗剪切区的方法的预测,解释和设计方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号