首页> 外文会议>International Conference on Recent Advances in Rock Engineering >Optimum blasting with precision delays and true bottom hole initiation through e-DET-ft at Jayant Project of NCL
【24h】

Optimum blasting with precision delays and true bottom hole initiation through e-DET-ft at Jayant Project of NCL

机译:通过E-DET-FT在NCL jayant项目中的精确延迟和真正的底部孔开始最佳爆破

获取原文

摘要

Mining companies the world over are seriously looking at the 'total cost concept' having fully realized the benefits of good fragmentation and muckpile looseness achieved in the primary blasts itself. Good blast planning and accurate monitoring of the various operations holds the key to reaping and realizing the benefits. In the Mining or Construction Industry, one should look at the total cost of operations and not, in isolation, individual costs of drilling and blasting (which includes explosives and initiation system costs). Poor blast results have a cascading effect on the cost of downstream operations of loading, hauling, crushing (where applicable) and also associated aspects such as secondary blasting and slope stability. Electronic detonators are extremely important tools for tomorrow's blasting needs in varied conditions for the reason they are precise in delay timing, field programmable, and much safer to use. They can reduce mining costs, when used technically correct. They can help mines in blast control and thus meet difficult environmental conditions with more productivity.
机译:矿业公司世界过度地看着“总成本概念”,充分意识到良好的爆炸本身达到了良好的碎片和笨拙的松动的益处。良好的爆炸计划和准确监测各种操作持有收获和实现福利的关键。在采矿或建筑行业中,人们应该看出业务总成本,而不是孤立,钻孔和爆破的个人成本(包括爆炸物和发起系统成本)。较差的爆炸结果对装载,牵引,破碎(在适用)的下游操作成本以及诸如二次爆破和边坡稳定性的相关方面具有级联影响。电子雷管对于明天的爆破需求在不同条件下是极其重要的工具,因此它们在延迟时序,现场可编程和使用更安全的原因。当在技术上正确使用时,它们可以减少采矿成本。他们可以帮助挖掘矿井,从而满足困难的环境条件,生产力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号