首页> 外文会议>International Conference on Construction and Building Engineering >Root causes occurrence of low BIM adoption in Malaysia: System dynamics modelling approach
【24h】

Root causes occurrence of low BIM adoption in Malaysia: System dynamics modelling approach

机译:马来西亚低BIM采用的根本原因:系统动力学建模方法

获取原文

摘要

The global implementation of BIM in the construction field is increasing worldwide. Due to the advantages offered by BIM, its implementation is considered important in the construction projects. Nevertheless, the Construction Industry Transformation Plan has reported that the adoption of Building Information Modelling (BIM) in Malaysia is still low and it is estimated at only 10 percent adoption amongst construction stake players. The barriers influencing the occurrence of low adoption BIM in Malaysia have been studied by some researchers. However, these researchers did not investigate the root causes which might lead to the recurring of the barriers to BIM adoption. Root causes that immediately occurrence of barriers, also known as precipitants or trigger causes. This conceptual paper developed the causal loop diagram (CLD) which presents the relationship between the perceived variables using system dynamic modelling approach. The findings revealed a novelty validated diagrams that design the holistic dynamic relationship on the root causes occurrence of low BIM adoption. Nonetheless, the diagram subject to more empirical testing for its practicability and further refinement upon more results expected to emerge as the research progresses.
机译:施工领域BIM的全球实施正在全球范围内增加。由于BIM提供的优势,其实现在建设项目中被认为是重要的。尽管如此,建筑业转型计划报告说,在马来西亚的建筑信息建模(BIM)的采用仍然很低,估计在建筑桩球员之间仅通过10%的采用。一些研究人员研究了影响马来西亚低采用BIM的障碍。然而,这些研究人员没有调查可能导致对BIM采用的障碍反复性的根本原因。根本原因立即发生障碍,也称为沉淀剂或触发原因。这种概念造纸开发了使用系统动态建模方法的感知变量之间的因果环图(CLD)。调查结果揭示了一种新颖的验证图,设计了对根本的整体动态关系导致低BIM采用的发生。尽管如此,该图对其实际测试进行了更实证的测试,并进一步改进在研究进展时预期的更多结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号