首页> 外文会议>Conference on Energy, Environment and Materials Science >Factors affecting the rapid excavation speed of rock roadways based on the blasting method
【24h】

Factors affecting the rapid excavation speed of rock roadways based on the blasting method

机译:基于爆破法影响岩路快速挖掘速度的因素

获取原文

摘要

Based on the current background of China's coal mines, major constraint factors restricting the excavation speed of blasting methods are analyzed: These include: (1) geological structures, especially in complex geological conditions; (2) equipment configurations, especially limited capacities of transportation equipment; (3) construction technologies; stale blasting technologies; (4) organizational processes, wasted time and non-parallelization in key processes; and (5) construction managements, unscientific construction organizations. Finally, some improvement measures to overcome the aforementioned factors are proposed.
机译:根据中国煤矿的当前背景,分析了限制爆破方法挖掘速度的主要约束因素:这些包括:(1)地质结构,尤其是复杂地质条件; (2)设备配置,尤其是运输设备的能力; (3)建筑技术;陈旧的爆破技术; (4)关键过程中的组织过程,浪费时间和非并行化; (5)施工管理,不科学的建筑组织。最后,提出了一些改进措施来克服上述因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号