首页> 外文会议>SPE African Health, Safety, Security and Environment and Social Responsibility Conference and Exhibition >Implementing An Impact Mitigation Hierarchy to Minimize Ecological Impacts; A Case Study of Seismic Survey in Murchison Falls National Park
【24h】

Implementing An Impact Mitigation Hierarchy to Minimize Ecological Impacts; A Case Study of Seismic Survey in Murchison Falls National Park

机译:实施影响缓解等级以最大限度地减少生态影响; 默奇森瀑布国家公园地震调查案例研究

获取原文

摘要

Total E&P Uganda undertook a 3D seismic survey in Exploration Area 1/1A lying within the Murchison Falls National Park. During the survey, an impact mitigation program was applied to; Avoid unnecessary damages; Minimize unavoidable damages; Restore damages; and Offset any residual damage to ecosystems. Here, we describe highly innovative approaches used in Avoidance, Minimization, and Restoration of impacts presented as a model for future operations in similar sensitive ecosystems. A simplified Avoidance model was designed to implement avoidance while Minimization involved use of alternative technologies such as cable-less technology, and vegetation mapping. Restoration involved use of both manual and mechanical methods. Unmanned Aerial Vehicle was also used to scout predefined seismic lines and monitor restoration. Ecological Compliance Officers supervised activities on ground to ensure enforcement of the Avoidance Mapping Procedure, identification of impacts and overseeing restoration of impacted areas. Consequently, there were generally few impacts resulting from avoidable damages. Impacted areas were identified, mapped and later restored. In total 64 tracks, 59 upholes and 30 patches were fully restored. Total of 40,328 avoidance features were mapped along approximately 3500kms of seismic lines. 678 features were later sampled and revisited after operations to assess compliance to Avoidance. Only one feature, a burrow was found impacted upon, having a tyre mark depression implying it may have been trampled by a vehicle.Observations indicate compliance by the Seismic crews, further suggesting the mitigation hierarchy is an effective impact mitigation measure.
机译:E&P uganda总共有一个探索区域1 / 1A的3D地震调查,位于默奇森瀑布国家公园。在调查期间,申请了影响缓解计划;避免不必要的损害;尽量减少不可避免的损害;恢复损害赔偿金;并抵消生态系统的任何剩余损坏。在这里,我们描述了在避免,最小化和恢复的高度创新方法,恢复为作为未来操作中的模型中的影响,以适用于类似敏感的生态系统。简化避免模型旨在实施避免,同时最小化涉及使用诸如有线技术的替代技术以及植被映射。恢复涉及使用手动和机械方法。无人驾驶飞行器也用于侦察预定义的地震线和监测恢复。生态合议官员对实时的监督活动,以确保执行避免绘图程序,识别影响和监督恢复受影响的区域。因此,避免损害造成的巨大影响通常很少。鉴定了影响的区域,映射到后来恢复。总共64个轨道,59个垫座和30个贴片完全恢复。沿着大约3500kms的地震线映射了40,328个避免特征。 678个功能后来被取样并在操作后重新审核,以评估避免遵守情况。只有一个特征,发现洞穴受到影响,具有轮胎标记凹陷,这可能已经被车辆践踏。能够表明地震船员的合规性,进一步建议缓解等级是有效的影响减缓措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号