Frontloading of OM experience in offshore wind farms - (PPT)

机译:海上风电场O&M体验的概况 - (PPT)

获取原文
获取外文期刊封面目录资料

摘要

The research in this paper reveals how operation and maintenance (O&M) experiences can contribute to reduction of the levelized costs of energy (LCOE). The research was conducted from June 2014 to May 2015, using a qualitative deductive research approach. Offshore wind farms are complex production systems (CoPS) as they are "small power plants at sea". This context has an important impact on the structuring of project management in offshore wind farms. The findings show a need for frontloading of an organization's previous experiences from offshore project suppliers, in order to plan for alternatives before the project starts. This approach is in contrast with the usual stage-gate approach in project management. Additionally there is a need for frontloading and continuous utilization of training from parallel projects and parallel components. Project management and project team members need awareness of both centralised knowledge creation captured in centralised processes and systems and locally distributed knowledge creation from uncertainty, and the opportunities emerging to make a contribution to reducing LCOE. A model called Project Management Frontloading in offshore wind is developed from the summary of research findings. The model can contribute to the change needed to integrate frontloading issues in future projects, both in relation to project management and project member activities. The model can also be used by academia for dissemination of the need and content for frontloading in offshore wind projects.
机译:本文的研究揭示了操作和维护(O&M)经验如何促成降低能源的调整成本(LCoE)。该研究是从2014年6月到2015年5月进行的,采用了定性的演绎研究方法。海上风电场是复杂的生产系统(警察),因为它们是“海上小电厂”。这方面对海上风电场的项目管理构建有重要影响。这些调查结果表明,从海上项目供应商到近海项目供应商的先前经验的需要,以便在项目开始之前计划替代品。这种方法与项目管理中的通常阶段栅栏方法形成鲜明对比。另外,需要从并行项目和并联组件的训练的前载和持续利用。项目管理和项目团队成员需要了解集中流程和系统中捕获的集中知识创建以及从不确定性的本地分布式知识创建,以及为减少LCOE做出贡献的机会。从研究发现摘要开发了海上风中称为项目管理档次的模型。该模型可以有助于将未来项目中的前载问题集成到项目管理和项目成员活动中所需的变化。该模型也可以由学术界使用,以传播海上风力项目中载荷的需求和内容。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号