Ramaco Resources, LLC and J.H. Fletcher recently collaborated to solve a unique geologic situation and safely increase the reserve extraction potential of Ramaco's Rockhouse Eagle mine. The mine is located in Logan County, West Virginia and was developed as a room and pillar operation with expected normal operating heights between 60" and 108", (1.52M and 2.74M). As mining progressed into the reserve and while Fletcher mobile roof supports, (MRS), were being procured and built, actual mining conditions varied substantially from expectations. Due to the presence of a previously undetected third split of coal in the seam, cavity heights had increased up to 22', (6.71 M). The planned MRS' being built even with traditional extensions that attach to the top of the MRS roof support plate would be incapable of reaching the mine roof. A taller reach MRS was not a viable option due to the increased collapsed height as the entrance to the mine was limited to 50", (1.27M), clearance. This paper will explain the collaboration between MSHA, Ramaco and Fletcher to develop an MRS with a tilting, mid-chassis extension designed to be installed on the machine underground to increase the range of the MRS.
机译:Ramaco资源,LLC和J.H.弗莱彻最近合作解决了独特的地质局面,安全地增加了拉马科皇家鹰矿的储备提取潜力。该矿山位于西弗吉尼亚州洛根县,被开发为一个房间和支柱操作,预期正常工作高度在60“和108”之间(1.52米和2.74米)。由于采矿进入储备,而在弗莱彻移动屋顶支持(MRS)的同时正在采购和建造,但实际采矿条件大大变化。由于接缝中煤的先前未被发现的第三分裂,腔高出增加至22',(6.71米)。计划的MRS即使是在屋顶支撑板顶部附着到顶部的传统延伸,也可以无法到达矿山屋顶。由于矿山入口限制在50“,(1.27米),清关。本文将解释MS MRS的折叠,(1.27米),较高的折叠高度,这不是一个可行的选择。本文将解释MSHA,Ramaco和Fletcher之间的合作,开发MRS搭配倾斜,中型底盘延伸旨在安装在机器地下,以增加MRS的范围。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号