首页> 外文会议>SPE Trinidad and Tobago Section Energy Resources Conference >Optimization under Uncertainty for Reliable Unconventional Play Evaluation.A Case Study in Vaca Muerta Shale Gas Blocks,Argentina
【24h】

Optimization under Uncertainty for Reliable Unconventional Play Evaluation.A Case Study in Vaca Muerta Shale Gas Blocks,Argentina

机译:可靠的非传统游戏评价不确定性下的优化。阿根廷Vaca Muerta Shale气体块的案例研究

获取原文

摘要

The objective of this work is to present a comprehensive workflow to optimize the value of a hydrocarbon asset evaluation project under high degrees of uncertainty.This workflow is applicable to both conventional and unconventional assets.However,because of the considerable level of subsurface uncertainty and high initial costs(mainly due to drilling and hydraulic fracturing operations),unconventional resources are good examples for demonstrating the benefits of the workflow.For the case of an unconventional asset,well spacing and perforation cluster spacing are usually the decision parameters that need to be optimized to increase its value.The workflow begins with the construction of a representative base case single well gas simulation model for production history matching.Petrophysical,geological,geomechanical,stimulation,completions and production data are interpreted and analyzed together to better understand drivers that could be influencing the production.If this can be repeated with several wells in the block with sufficient production data,the process is enriched as so the level of confidence,as the range of history-matching parameters from these different wells across the block can be captured for sensitivity and uncertainty analysis.Several sets of sensitivities and uncertainty runs are then performed to get a probabilistic production profile in the presence of the most influential parameters.It is important to highlight that usually,the limited number of wells,short production histories,different dynamic behavior in neighboring blocks and the lack of necessary data to help understand well performance all contribute to the high uncertainty in predicting production.Given the high cost of drilling and hydraulic fracturing and on the other hand the high gas price in Argentina,optimizing well spacing and cluster spacing are critical parameters in the process of unconventional resource evaluation considering the high degree of uncertainty.
机译:这项工作的目的是提供全面的工作流程,以优化碳氢化合物资产评估项目的价值在高度的不确定性下。此工作流程适用于传统和非传统的资产。然而,由于地下不确定性相当大,因此初始成本(主要是由于钻井和液压压裂操作),非常规资源是展示工作流程的好处的良好示例。对于非传统资产的情况,井间距和穿孔簇间距通常是需要优化的决策参数以增加其价值。工作流程开始于一个有代表性的基本情况单井气仿真模型的生产历史matching.Petrophysical的建筑,地质,地质力学,刺激,完井和生产数据进行解释和分析,可以更好地了解驱动程序可能是影响生产。如果这可以重复在具有足够的生产数据的块中有几个井,因此可以捕获来自这些不同井的历史匹配参数的历史匹配参数的范围以获得灵敏度和不确定性分析。敏感性的历史匹配参数的范围。敏感性然后执行不确定性运行以在存在最有影响力的参数存在下获得概率的生产概况。它的突出显示通常,井数量有限,较短的生产历史,邻近块中的不同动态行为以及缺乏必要的情况有助于了解井的性能都有助于预测生产的高不确定性。从钻孔和液压压裂的高成本,另一方面,阿根廷的高气价格,优化井间距和簇间距是过程中的关键参数考虑到高度不确定性的非传统资源评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号