首页> 外文会议>POWER-GEN Natural Gas Conference >Uncertainty in Risk Based Resource Planning (PPT)
【24h】

Uncertainty in Risk Based Resource Planning (PPT)

机译:基于风险的资源规划(PPT)的不确定性

获取原文

摘要

1.The regional supply composition and market structure are key determinants to the value of flexible generation 2.Value can be distilled into a couple of critical factors: 3.Regulation prices > $12/MWh 4.High volatility in real-time prices (>110%) 5.Trend of volatility and regulation prices 6.Future fundamentals (changes in supply) play a critical role 7.SPP 47% reserve margins 8. Coal and wind generation lowest energy prices in country 9.High ancillary prices and real-time price volatility opportunity for fast flex-ramp resources 10 CAISO has lowest ancillary service prices in US by 50% and lowest price volatility 11 Substantial hydro storage and interconnection ties to hydro storage 12 Lowest ancillary service prices in US by 50% and lowest price volatility with decreasing trend
机译:1.区域供应组成和市场结构是灵活生成价值的关键决定因素2.维拉伊可以蒸馏成几个关键因素:3.调高价格> 12美元/兆瓦2.实时价格(> 110%)5.波动性和监管价格6.财务基础(供应变化)发挥关键作用7.SPP 47%储备利润率8.煤炭和风发电最低能源价格在国家9.高级辅助价格和真实的快速Flex-Ramp资源的时间价格波动机会10 CAISO在美国拥有50%和最低价格波动性的辅助服务价格11大量的水力储存和互连联系,与水电储存12件最低的辅助服务价格在50%和最低价格波动中随着趋势的降低

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号