Powering Douala: The 21-Day Installation of a 50 MW Natural Gas Power Plant that Added Reliable Power to Cameroon’s Grid

机译:Powering Douara:21天安装50 MW天然气电厂,为喀麦隆的网格添加了可靠的电力

获取原文

摘要

The natural gas power plants had to be operational within 30 days from the time the equipment and engineering teams arrived at site. In order to meet this deadline, installation procedures had to be done right at first instance, and the power plants had to be urgently installed and directly connected to the existing grid. For the power plant sites, Eneo provided locations that were already confined and that had specific dimensions and area limitations. Owing to this, the power plants should be specially designed to fit in the constrained space at the indicated sites.
机译:自然燃气电厂必须在设备和工程团队到达现场后30天内进行操作。为了满足此截止日期,必须首先正确完成安装程序,并且必须迫切地安装电厂并直接连接到现有网格。对于电厂网站,Eneo提供了已经限制的位置,并且具有特定的尺寸和面积限制。由于这一点,电厂应特别地设计成适合指示位点的受限空间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号