首页> 外文会议>North American Society for Trenchless Technology no-dig show >What's the True Cost of Rehabilitation? – Calculating Lifecycle Costs for Trenchless Technologies in Portland, Oregon
【24h】

What's the True Cost of Rehabilitation? – Calculating Lifecycle Costs for Trenchless Technologies in Portland, Oregon

机译:康复的真正成本是多少? - 计算波特兰,俄勒冈州波特兰技术的生命周期成本

获取原文

摘要

The Taggart Outfall 30 is one of the longest-serving large diameter sewer pipes in the City of Portland. The 7,600 LF, 66-120" brick sewer was constructed in 1906 to replace cesspools and reduce the death rate from typhoid fever and other infectious diseases in the densely settled neighborhoods. At the time, it was the largest diameter and most expensive sewer Portland had constructed with an initial budget of $250,000. Over the past century, the City's Bureau of Environmental Services has utilized this asset with multiple tie-ins, diversion structures, and retrofits that allow the tunnel to function today as a critical piece of the combined sewer infrastructure as collection and overflow. As part of their proactive approach to asset management, the City identified the Taggart Outfall as a candidate for rehabilitation to extend the life of the asset and maintain the system for the years to come. This paper will review the background, preliminary design & alternatives analysis with discussion on the unique structural and geotechnical considerations and a description of the lifecycle net benefit-cost ratio (nBCR) method.
机译:该塔格特排污口30是在波特兰市的任职时间最长的大口径污水管道之一。 7600 LF,66-120" 砖下水道在1906年建造,以取代污水池,减少从密集入驻街区伤寒等传染病的死亡率。在当时,这是最大直径和最昂贵的下水道了波特兰以$ 250,000。在过去的一个世纪的最初预算构造,环境服务的市的局利用这一资产与多个搭售,引水建筑物和改造,使隧道的功能今天的综合下水道基础设施的关键部分为收集和溢出。由于他们积极的态度,资产管理的一部分,市确定的塔格特排污口为候选人的康复,延长资产的使用寿命和维护体系,为今后几年。本文将回顾的背景下,在独特的结构和岩土工程方面的考虑初步设计和方案分析讨论和生命周期网络可用的描述nefit成本比(NBCR)方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号