首页> 外文会议>SPE Intelligent Energy International Conference and Exhibition >Integrated Planning to Optimize Field Development Strategies and Real Time Decision Making During Project Execution for Large Scale Shale Resource Projects
【24h】

Integrated Planning to Optimize Field Development Strategies and Real Time Decision Making During Project Execution for Large Scale Shale Resource Projects

机译:综合规划,优化实地开发策略和大型页岩资源项目项目执行期间的实时决策

获取原文

摘要

Integrated planning unveils insight into a large project and all its bottlenecks for every discipline. In order to optimize utilization of facilities, optimize scheduling and its subsequent operations, an integrated planning tool was developed especially for large scale and complex shale resource projects. The best option to come up with a suitable planning tool for such projects was found to be an Agent Based Model (ABM). Flexible definition of the individual components of the model, which comprises the subsurface, surface data, and the physical representation of wells, pipelines and equipment, allows effective strategy testing of various scenarios. With the chosen approach, results could be obtained fast and also numerous variations of the original development strategy could be tested and included. It can be shown that through optimization of facilities and optimized scheduling for an asset, economical benefits can be found effectively. It tremendously reduces the time for strategy testing of conventional approaches and also updates due to new development strategies as new information is available. Scheduling and an analysis of various drilling strategies allow a further reduction of economics. It can be concluded that this approach allows more effective testing of strategies for large assets, which involves cross-functional decision making. It allows effective communication and immediately shows possible shortcomings of any strategy which otherwise would be overlooked with any other approach that does not involve everything from the resource itself, to the production system, contractual conditions as well as a representation of the actual field operations.
机译:综合规划介绍了对大型项目的洞察力,以及所有学科的所有瓶颈。为了优化设施的利用率,优化调度及其随后的操作,开发了一个集成的规划工具,特别是对于大规模和复杂的页岩资源项目。找到了用于此类项目的合适规划工具的最佳选择是基于代理的模型(ABM)。灵活的定义模型的各个组件,包括井,管道和设备的地下,表面数据和物理表示,允许有效的各种场景的策略测试。利用所选择的方法,可以快速获得结果,并且可以测试原始开发策略的许多变化也可以进行测试和包括。可以表明,通过优化设施和优化的资产调度,可以有效地发现经济效益。由于新信息可用,因此它大家缩短了传统方法的战略测试的时间,也是由于新的开发策略而更新。调度和各种钻井策略的分析允许进一步减少经济学。可以得出结论,这种方法允许对大型资产的策略进行更有效的策略测试,这涉及跨职能决策。它允许有效的沟通,并立即显示任何策略的可能缺点,否则将被忽视的任何其他方法,这些方法不涉及从资源本身的所有内容到生产系统,合同条件以及实际现场操作的代表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号