首页> 外文会议>World Tunnel Congress >3-Dimensional Analysis of EPB TBM Operation in Close Proximity to Pile Foundations
【24h】

3-Dimensional Analysis of EPB TBM Operation in Close Proximity to Pile Foundations

机译:桩基近距离近距离EPB TBM操作的三维分析

获取原文

摘要

This paper presents an assessment of the impact of tunneling and its associated risks on pile foundations located in the influence zone of tunneling operation. Tunneling in proximity of pile foundations introduces deformations in piles and in turn induces additional axial and bending forces. In modern mechanized tunneling, ground convergence is controlled through balancing the earth pressure at the tunnel face as well as applying pressurized bentonite through the shield. Reducing ground deformation can consequently lower the additional deformations and forces developed in the pile foundation and lessen the associated construction risk. In this paper, comprehensive detailed finite element modeling was performed to quantify the effect of the different parameters on induced forces in piles. Finite element models took into account the nonlinear behavior of soil and pile-soil interface. The modeling results are of practical importance in risk evaluation of tunneling in vicinity of pile foundations.
机译:本文介绍了隧道隧道的影响及其在隧道运行影响区的桩基上的影响。在桩基附近的隧道引入堆中的变形,又引起额外的轴向和弯曲力。在现代机械化隧道中,通过平衡隧道面的地球压力来控制地面收敛,以及通过屏蔽施加加压膨润土。因此,降低地面变形可以降低桩基中产生的额外变形和力,并减少相关的施工风险。在本文中,进行了综合详细的有限元建模,以量化不同参数对桩中诱导力的影响。有限元模型考虑了土壤和桩土界面的非线性行为。建模结果对桩基附近的隧道风险评估具有实际重要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号