The Sanitation Districts of Los Angeles County is planning to construct a new, approximately 7-mile-long (11.3 km) effluent outfall tunnel to be excavated by TBM and lined with precast concrete segments. Anticipated net operating pressures within the tunnel are expected to approach 3 bar. To counteract joint opening and exfiltration leakage, an approach has been investigated to post-tension the precast concrete tunnel lining with steel tendons. The tunnel alignment crosses several seismically active fault zones, at which installation of steel pipe is proposed as a secondary inner lining to mitigate potential offset displacements. This paper discusses the tunnel lining design approach and methods used to address these unique challenges.
机译:洛杉矶县的卫生区正在计划建造一个新的大约7英里长(11.3公里)的污水排污隧道,由TBM挖掘并衬有预制混凝土段。预计隧道内的预期净操作压力预计将接近3巴。为了抵消联合开口和抗滤成泄漏,已经研究了一种方法,以钢筋伸缩钢筋延伸。隧道对准穿过几个地震活动断层区域,在该地震中的故障区上,提出了钢管的安装作为次级内衬,以减轻电位偏移位移。本文讨论了用于解决这些独特挑战的隧道衬里设计方法和方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号