首页> 外文会议>SPE Heavy Oil Conference and Exhibition >Maximizing VOI of Frequent Seismic Monitoring of Heavy Oil Fields: Case Study at Peace River Pad 31
【24h】

Maximizing VOI of Frequent Seismic Monitoring of Heavy Oil Fields: Case Study at Peace River Pad 31

机译:最大化频繁地震监测的VOI重型油田:和平河垫31的案例研究

获取原文

摘要

In May 2014 a permanent seismic monitoring system was deployed in Peace River Pad 31 to monitor areal steam conformance during pad re-development in this heavy oil field in Alberta, Canada. The dataset comprises a two-year monitoring period and was used within the Well and Reservoir Management framework to optimize production performance and increase field recovery. With seismic snapshots available daily, one area of investigation was to determine the monitoring frequency that maximizes Value of Information (VOI). A lookback study with a panel of independent experts showed that for the particular case of Pad 31, with very limited control due to the existing well completions, quarterly monitoring would be sufficient. Additionally, guidelines were developed for defining an effective seismic monitoring program (e.g., align monitoring with major field interventions, allow enough time for changes to be actionable, etc.). Although based on observations from the Pad 31 trial, these guidelines should be applicable to other thermal developments in heavy oil fields.
机译:2014年5月,在和平河垫31中部署了永久地震监测系统,以监测在加拿大艾伯塔省的重型油田垫重新开发期间的区域蒸汽一致性。数据集包括两年的监测期,并在井和水库管理框架内使用,以优化生产性能并提高现场恢复。每天可用地震快照,一个调查领域是确定最大化信息价值(VOI)的监测频率。与独立专家面板的一项寻求研究表明,对于垫31的特定情况,由于现有的井完井而导致的控制非常有限,季度监测就足够了。此外,为定义有效地震监测计划而开发了指导方针(例如,将监测与主要场干预措施对齐,允许足够的时间进行可操作等。虽然根据垫31试验的观察,但这些指南应适用于重油场中的其他热发射。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号