首页> 外文会议>Abu Dhabi International Petroleum Exhibition Conference >Swift Solutions to Avert Major Structural Failures
【24h】

Swift Solutions to Avert Major Structural Failures

机译:避免主要结构失败的迅速解决方案

获取原文
获取外文期刊封面目录资料

摘要

In today's challenging work and business environment, swift response to structural integrity concerns is the need of the hour to minimize the damages that will reduce down time, specifically in oil & gas sector. The solution devised to address structural concerns shall prevent further failure of structural members and avert major catastrophic accidents, as they support process equipment and piping. This paper outlines case studies of such structural failures, potential reasons of incidents and approaches followed in restoring structural integrity in a safe and economical way that ensures uninterrupted plant operation. Key parameters to be studied / considered while arriving solutions to structural damage / incidents include reliability of data, primary cause of incident, inventory of readily available material, execution feasibility under plant operating conditions thereby avoiding plant or unit shutdowns and manpower skillsets. Due to various constraints, the solution arrived may be temporary that averts multiple structural failures or a major accident. Further studies would be required to identify the root cause and to confirm or enhance the implemented solution that will reaffirm long term integrity of structure. In almost all of the incidents, some of the common steps followed for swift restoration of structural integrity include conducting a site survey to identify and judge the probable cause, reviewing available data, structural assessment and details of material in stock. After analyzing numerous factors, diverse approaches unique to each incident were considered in arriving a solution that is fit-for-purpose. Structural integrity issues, if not attended swiftly, can worsen the situation leading to safety concerns and major accidents. Solutions adopted for various incidents ensured restoration of structural integrity with minimal consequences. Suggested improvements and recommendations were implemented and no further issues were reported until this time.
机译:在今天的挑战性工作和商业环境中,迅速对结构诚信担忧的回应是需要一个小时,以尽量减少减少减少时间,特别是石油和天然气部门的损失。设计解决结构问题的解决方案应防止结构成员和避免主要灾难性事故的进一步失败,因为它们支持流程设备和管道。本文概述了这种结构故障的案例研究,事故和方法的潜在原因,以安全和经济的方式恢复结构完整性,确保不间断的工厂运作。要研究/考虑的关键参数/考虑到结构损伤/事件的解决方案包括数据的可靠性,事件的主要原因,易于获得的材料库存,在工厂操作条件下的执行可行性,从而避免了工厂或单位停机和人力技能。由于各种约束,解决方案到达可能是暂时的,以避免多个结构失败或重大事故。进一步的研究将被要求识别根本原因并确认或加强将重申长期结构的实施解决方案。在几乎所有的事件中,一些常用步骤,随后迅速恢复结构完整性包括进行现场调查,以识别和判断可能的原因,审查可用数据,结构评估和材料中材料的细节。在分析众多因素之后,在到达适合目的的解决方案时考虑了对每个事件独特的不同方法。结构诚信问题,如果没有迅速参加,可以恶化导致安全问题和主要事故的情况。各种事件采用的解决方案确保了以最小的后果恢复结构完整性。提出了建议的改进和建议,直到这一次没有报告进一步的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号