Pad Drilling Concept was developed to increase and sustain the production rate one of the UAE Brownfield Onshore Oilfield (BO) from four different reservoirs. The surface facilities of the field will accommodate total of 80Mbd and technical rate of 96Mbd. The project scope was redefined in 2016 to enhance the overall project's cost and further study on newly developed reservoir (Reservoir "A"). The project came into execution since January 2018 and so far, 100 plus wells drilled successfully. Therefore, to accommodate the required number of wells based on the company production target ahead of time, the planning stage represented as per 2018-2022 business plan is maintained with first oil in Q1 2020. The Full Field Development Plan (FFDP) is to deliver a total of 210 wells to sustain the production rate beyond 2024. Thus, the selected scheme for the FFDP which is planned to be artificially lifted is based on water injection and water alternating gas injection (WAG). The Key aspects of the project are: 1. Partial development of Reservoir "A" 2. Sensitive environmental area 3. Brownfield development in Simultaneous Operations (SIMOPS) conditions. 4. Directional Drilling trajectory and anticollision constrains. Critical success factors for this project are: 1. Integrated Project Management Team with dedicated full time resources 2. Appointment and selection of competent Engineering contractor to develop the facilities within the target time. 3. Timely approval and implementation of project's milestone. Thus, the benefits from the project for this Field are: 1. Optimized Field Development Plan; 2. Prevent congestions & access constraints; 3. Standardization of HSE & Operations; 4. Economical Surface Facilities Management. 5. Rig days and cost saving. 6. Sweep Efficiency of the reservoir. 7. Early completion / production of project.
机译:开发了垫钻孔概念,以增加和维持来自四个不同水库的阿联酋布朗菲尔德陆上油田(Bo)之一。该领域的表面设施将容纳80MBD和96MBD的技术率。项目范围在2016年重新定义,以提高整体项目的成本和对新开发的水库(水库“A”)的进一步研究。该项目自2018年1月落后于2018年1月以来进入执行,迄今为止,100多井井成功钻探。因此,根据公司生产目标提前满足所需数量的井,根据2018-2022商业计划代表的规划阶段由第1季度第1季度维持。全场发展计划(FFDP)是提供总共210个井以维持2024年的生产率。因此,计划在计划人工上升的FFDP的所选方案基于注水和水交替气体注入(摇摆)。该项目的关键方面是:1。储层的部分发展“A”2.敏感环境区域3.棕色菲尔德在同时操作(SIMOPS)条件下的开发。 4.定向钻井轨迹和反抗约束。该项目的关键成功因素是:1。集成项目管理团队,专门的全职资源2.任命和选择主管工程承包商,以在目标时间内开发设施。 3.及时批准和实施项目的里程碑。因此,该领域项目的好处是:1。优化的现场开发计划; 2.防止拥塞和访问约束; 3. HSE和运营的标准化; 4.经济的表面设施管理。 5.钻机日和节省成本。 6.水库的扫描效率。 7.早期完成/生产项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号