First MLTBS Level 5 Installation for Operator in Abu Dhabi

机译:第一个MLTBS 5级安装在阿布扎比的操作员安装

获取原文

摘要

A major Abu Dhabi oil and gas producer targeted an increase in production from their major offshore oilfields. Better optimization of the reservoir through advanced well architecture was considered an option. One way to achieve this objective was through accessibility and hydraulic control of all horizontal drains. Multilateral technology is commonly used to increase the production per well and reduce drilling time while optimizing production facilities. The project targeted multiple reservoirs with two separate laterals to meet reservoir requirements. The application required individual through tubing access for intervention into each lateral. Multilateral technology has been traditionally limited to commingled production with limited or no access to the laterals. To help address and overcome these challenges, the operator planned and installed their first Level 5 multilateral tieback system (MLTBS).
机译:Abu Dhabi石油和天然气生产商的主要船舶占有近海油田的增加。通过先进的井架构更好地优化水库被认为是一个选择。实现这一目标的一种方法是通过所有水平排水沟的可访问性和液压控制。多边技术通常用于增加每井生产,并在优化生产设施的同时减少钻井时间。该项目针对多个水库,两个单独的侧面符合储层要求。应用程序需要通过管道进入介入每个横向的管道。多边技术传统上仅限于带有有限或无法进入横向的生产。为了帮助解决和克服这些挑战,运营商计划并安装了他们的第一级多边修件系统(MLTB)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号