首页> 外文会议>International Peat Congress >USE OF WOOD-CHIP BARRIERS FOR WATER PROTECTION AT PEAT PRODUCTION SITES - PRINCIPLES AND IMPLEMENTATION
【24h】

USE OF WOOD-CHIP BARRIERS FOR WATER PROTECTION AT PEAT PRODUCTION SITES - PRINCIPLES AND IMPLEMENTATION

机译:使用木屑屏障在泥炭生产基地进行防水保护 - 原则和实施

获取原文

摘要

Towards the end of the service life of a peat production area, production can be prolonged by moving the peat from every second strip into the intervening strips with an excavator, levelling it off with a bulldozer and forming new strips for extraction in the normal way. This also implies a change in drainage conditions, however, as the strips from which the peat has been removed are left as areas of mineral soil, so that new drainage ditches frequently have to be dug in them. The water from these ditches is then conducted into the main collecting ditches either via the original ditch marking the boundary of the strip, or via a new one dug for the purpose. These new arrangements will mean that the original slurry troughs and basins and the slurry retainers in the balk pipes are bypassed, so that the drainage water can flow directly into the collecting ditches unless new retention systems are constructed.
机译:在泥炭生产面积的使用寿命结束时,通过将泥煤从每秒带入挖掘机的介入条,可以长时间延长生产,用推土机调平并以正常方式形成新条带。 这也意味着排水条件的变化,然而,由于泥炭被移除的条带留成矿物土壤的区域,因此通常必须在它们中挖掘新的排水沟。 然后通过原始沟标记带材的边界,或者通过为目的的新挖掘进行来自这些沟渠的水。 这些新的安排将意味着旁路胎管中的原始浆料槽和盆地和浆料保持器,使得排水水可以直接流入收集沟渠,除非构建了新的保留系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号