首页> 外文会议>International Conference on Mechatronics, Materials, Biotechnology and Environment >Study on the determination of the reasonable finished state for cable-stayed bridge with hybrid girder
【24h】

Study on the determination of the reasonable finished state for cable-stayed bridge with hybrid girder

机译:用杂交梁测定斜拉桥斜拉桥合理完成状态的研究

获取原文

摘要

In order to obtain the optimal values of cable force, and determine the reasonable finished bridge state for large span Cable-stayed bridge with hybrid girder, the space finite element simulation analysis model of the whole bridge is established, considering the characteristics of its span arrangement and structure, analysis the method and basic principles for determining the reasonable finished bridge state, calculated with the influence matrix method and minimum bending energy method, and the objective function is minimization the maximum displacement of tower and girder. Through calculation, the stress of the main pylon, the main girder and the stay cables in the finished state and the operating state can satisfy the requirements of standard, the reasonable finished state of cable-stayed bridge in accordance with the requirements.
机译:为了获得电缆力的最佳值,并确定具有混合梁的大跨度斜拉桥的合理成品桥接状态,建立了整个桥梁的空间有限元模拟分析模型,考虑到其跨度排列的特性和结构,分析采用影响矩阵法和最小弯曲能量方法计算合理的成品桥状态的方法和基本原理,目标函数最小化塔和梁的最大位移。通过计算,主塔的应力,主要梁和成品状态下的支承电缆和运行状态可以满足标准的要求,根据要求,可接受的斜拉桥的合理成品状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号