In-Situ Monitoring of Side Friction of Drilled Piles by Different Loading Methods

机译:不同装载方法的原位监测钻桩侧摩擦

获取原文

摘要

Side frictions of three groups of drilled piles under different loading methods in Xinwan interchange of Qianjiang Passageway and Connecting Project were monitored. Group 1 was loaded by static loading test method. The other two groups were loaded by dead load of superstructures, which were constructed using segmental hanging basket method and overall support cast-in-place method respectively. Axial forces and Side friction in all the piles increased gradually during the load-adding procedure. Group 1 was loaded two months after the finish of pile foundation construction, while group 3 started bearing the action of superstructure dead load six months after the finish of pile foundation construction. Piles in Group 1 and Group 3 have different repose time. Side frictions monitored from piles in Group 3, which have longer repose time, were larger than those in Group 1 under the same load. Side frictions monitored from piles in Group 2, which have longer off-time between two loading stage, were larger than those in Group 1 under the same load.
机译:监测了黔江通道新湾交汇处不同装载方法下三组钻桩的侧面摩擦。第1组通过静态负载测试方法装载。通过分段悬挂篮法和整体支撑铸造方法的上层建筑的死载荷加载另外两组。在负载加载程序期间,所有桩中的轴向力和侧摩擦逐渐增加。第1组在桩基建设完成后2个月装载,而第3组开始占桩基建设竣工后六个月的上层建筑死载的作用。第1组和第3组的桩具有不同的休息时间。在第3组中监测的侧面摩擦,其具有较长的休息时间,比在相同负载下的第1组中的侧面。在两个加载阶段之间具有较长的截止时间的桩在两个加载阶段之间的侧面摩擦大于相同负载下的第1组。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号