首页> 外文会议>International Conference on Ramp-Up Management >An approach to reduce commissioning and ramp-up time for multi-variant production in automated production facilities
【24h】

An approach to reduce commissioning and ramp-up time for multi-variant production in automated production facilities

机译:一种减少自动化生产设施多变体生产的调试和增值时间的方法

获取原文

摘要

A key requirement for future production facilities is to perform new production processes in a flexible and adaptive way with available and known resources. In this context, a comprehensive description [ontology) of involved components has a high significance. If certain technological aspects are missing during a production process, the production control should respond in a dynamic, versatile and adaptive (agile) manner to the overall value network. The possibility to describe the requirements of products for the necessary processes in the same namespace like the requirements of the necessary processes for the resources is a prerequisite to enable this behavior. Afterwards the different requirements will be placed in relation to the respective requirements. The aim is to define the necessary processes for the production based on the description of the product and the known resources in an agile way. Due to this a framework for a comprehensive description of automated production facilities, products and processes is described in this paper. The idea is that based on this framework a production facility can change the produced products without dedicated commissioning and ramp-up phases.
机译:未来生产设施的关键要求是以可用和自适应方式进行新的生产流程,可用可用和已知的资源。在这种情况下,涉及组件的综合描述[本体)具有很高的意义。如果在生产过程中缺少某些技术方面,则生产控制应以动态,多功能和自适应(敏捷)方式响应整体价值网络。描述产品对必要过程的需求的可能性,如相同的命名空间,如资源的必要流程的要求是启用此行为的先决条件。之后,不同的要求将与各自的要求进行。目的是根据产品描述和以敏捷方式的描述来定义生产的必要过程。由于这本文描述了一个框架,用于全面描述自动化生产设施,产品和工艺。这个想法是,基于这一框架,生产设施可以改变生产的产品,无需专用调试和斜坡阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号