Economic Analysis of the Integrated Operation Mode of Nuclear Power Station and Pumped-storage Power Station

机译:核电站综合运行模式经济分析及泵送蓄能电站

获取原文

摘要

This paper proposes the integrated operation mode of nuclear power station and pumped-storage power station, and makes an intensive economic analysis of the integrated operation mode based on the position of investors. Firstly, this paper thoroughly discussed the calculation method of annual cost in two schemes: (a) investors only operate nuclear power station and pay peak load regulation compensation; (b) investors operate nuclear power station and pumped-storage power station jointly to participate in electricity network load adjustment. And cost comparison method was used to compare the economy of two schemes. Secondly, this paper took a nuclear power investor's two operation schemes as an example, and compared the annual cost of each scheme. Ultimately, the case study shows that: the annual cost of integrated operation mode is lower than the annual cost of peak load regulation compensation borne by nuclear power investor, that is to say, the integrated operation mode of nuclear power station and pumped-storage power station is more economical.
机译:本文提出了核电站和泵送存储电站的综合运行方式,并根据投资者位置对集成运行模式进行了密集的经济分析。首先,本文彻底讨论了两种计划的年成本计算方法:(a)投资者只运营核电站并支付峰值负荷调节补偿; (b)投资者共同运营核电站和泵送存储电站,参与电力网络负荷调整。和成本比较方法用于比较两种方案的经济。其次,本文采用了核电投资者的两项操作计划,并与每个计划的年费比较了。最终,案例研究表明:综合运营模式年成本低于核电投资者峰值负荷调节补偿年度成本,也就是说,核电站综合运行方式和泵送电力站更经济。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号