Managing the room of maneuver in design build contracts-a comparative study of Norwegian road projects

机译:管理设计建设合同中的机动室 - 挪威道路项目的比较研究

获取原文
获取外文期刊封面目录资料

摘要

Most public infrastructure projects in Norway are conducted with design-bid-build contract form. However, the traditional design-bid-build contract seems to be both time consuming and demand a lot of resources. And at the same time contribute to a high level of conflict between the project owner and the contractor. Because of this, and an increased amount of big and complex infrastructure projects, public project owners are boosting their use of design-build contracts. Use of design-build contracts can potentially shorten project time, and reduce cost. In addition, the use of this contract form can release the project owner's resources and make use of the contractor's competence. Within the design-build contract form and delivery method there is a certain room of maneuver. This can be utilized and potentially contribute to achieve the mentioned benefits. The problem occurs when the public project owner's laws and regulations limits this room of maneuver, and puts too many restrictions on the contractor's choice of technical solutions and ways of construction. To explore this a literature review and multiple case studies were conducted. Four public road projects were explored through semi-structured in depth interviews and document studies. This identified the room of maneuver in the studied projects, as well as the potential room of maneuver for the projects. The level of detail set in the contract by the project owner, through deployment of the laws and regulations, seems to be the most critical factor. This decides whether the contractor has a satisfying room of maneuver or is too restricted and not able to propose and execute alternative solutions.
机译:挪威的大多数公共基础设施项目都以设计出价的合同形式进行。但是,传统的设计出价合同似乎耗时和需求大量资源。同时有助于项目所有者和承包商之间的高度冲突。因此,增加了大型和复杂的基础设施项目,公共项目业主正在推动他们对设计建立合同的使用。使用设计 - 构建合同可能会缩短项目时间,降低成本。此外,使用本合同表格可以释放项目所有者的资源,并利用承包商的能力。在设计 - 构建合同形式和交付方法中,有一定的机动空间。这可以利用并可能有助于实现提到的益处。当公共项目所有者的法律法规限制了这一机动的房间时,会出现问题,并对承包商的技术解决方案和建设方式进行太多限制。为了探索这一文献综述和多种案例研究。通过半结构化的深度访谈和文件研究,探索了四个公共道路项目。这确定了研究项目中的机动室,以及项目的潜在室。通过部署法律法规,项目业主在合同中设定的详细程度似乎是最关键的因素。这决定了承包商是否有一个令人满意的机动空间或者过于限制,无法提出和执行替代解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号