首页> 外文会议>Creative Construction Conference >Saudi Arabian aviation construction projects: Identification of risks and their consequences
【24h】

Saudi Arabian aviation construction projects: Identification of risks and their consequences

机译:沙特阿拉伯航空建设项目:识别风险及其后果

获取原文

摘要

Airport projects are considered to be very complex, as they face a number of challenges which inevitably expose them to risks. In Saudi Arabia, the aviation sector is considered an important sector due to the fact that Saudi Arabia is the first destination for Muslims on an annual basis. As a result, the Saudi government has allocated a significant amount of its general budget to this sector through the General Authority of Civil Aviation (GACA). However, it has been found that these projects are still delivered with a significant number of time and cost overruns. These consequences are typically generated from the risks involved in the projects. Thus, the aim of this paper was twofold: first to identify risks associated with aviation construction projects in Saudi Arabia and, second, to evaluate the consequences of these risks on a number of GACA projects. Critical literature reviews of common risks associated with aviation projects have been carried out. These were followed by 13 semi-structured interviews with expert project managers, including clients, contractors and consultants who have been involved in GACA projects. As a result, 54 new risks have been identified and classified into three levels: internal, external and force majeure. Results have confirmed the existence of time and cost overruns for GACA projects. The significance of the identified risks is currently being assessed and will be reported in a further paper.
机译:机场项目被认为是非常复杂的,因为它们面临着一些挑战,这不可避免地将它们暴露于风险。在沙特阿拉伯,航空部门被认为是一个重要的部门,因为沙特阿拉伯是每年穆斯林的第一个目的地。因此,沙特政府通过民航(GACA)总督分配了这一部门的大量总预算。但是,已经发现这些项目仍然具有大量的时间和成本超支。这些后果通常是从项目中涉及的风险产生的。因此,本文的目的是双重组合:首先要识别与沙特阿拉伯的航空建设项目相关的风险,而第二个,评估这些风险对多种GACA项目的后果。已经进行了与航空项目相关的共同风险的关键文献综述。随后,与专家项目经理进行了13个半结构化访谈,包括参与Gaca项目的客户,承包商和顾问。因此,已经确定了54个新风险并分为三个层面:内部,外部和不可抗力。结果证实了Gaca项目的时间和成本超支的存在。目前正在评估所识别的风险的重要性,并将在另一个文件中报告。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号