首页> 外文会议>International Forum on Energy, Environment Science and Materials >Seepage Safety Assessment for Baiyun Hydropower Station
【24h】

Seepage Safety Assessment for Baiyun Hydropower Station

机译:白云水电站渗流安全评估

获取原文

摘要

Baiyun Hydropower Station is located in Chengbu County, Hunan Province, which is 5km from the county town. By combining the analysis of monitoring data of leakage amount of above-mentioned dam and the numerical calculation results, it is concluded that, there are serious leakage at the lower face of left bank and near the toe board, which results in the potential safety hazard of major seepage flow. In accordance with "Guidelines on Dam Safety Evaluation", the seepage property of Baiyun hydropower dam is rated as Grade "C".
机译:Baiyun水电站位于湖南省成都县,距县城5公里。通过组合上述大坝泄漏量的监测数据和数值计算结果的分析,得出结论,左岸的较小面和脚趾板上存在严重泄漏,从而导致潜在的安全危险主要渗流流。按照“大坝安全评估指南”,白云水电坝的渗流性质被评为“C”等级。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号