A CONSTRUCTION PROCUREMENT METHOD TO ACHIEVE SUSTAINABILITY IN MODULAR CONSTRUCTION

机译:建筑采购方法实现模块化建设的可持续性

获取原文

摘要

Modular or prefabricated construction has gradually replacing the traditional on-site construction due to the benefits provided, notably faster time, reduced costs, better work quality, and less environmental impacts. Prefabricated construction guaranties more control over the quality of components and safety of the construction process. However, some other concerns such as design considerations and coordination of factory and on-site activities, may be easily undermined if an appropriate procurement method is not selected. In a precast concrete construction, for instance, precast members require highly skilled workers, more complex techniques, and a more complex design. Because the design professionals need to concentrate on perfecting the modular design, the intensive administrative work may be neglected. To include these managerial task in a modular construction's equation, this study presents a fundamental understanding of modular and/or pre-fabricated systems and suggests a construction procurement method based on project type to satisfy this short coming and to achieve sustainable modular construction.
机译:由于提供的益处,模块化或预制结构逐渐取代了传统的现场施工,特别是更快的时间,降低成本,更好的工作质量,更少的环境影响。预制施工担保更多控制构件质量和施工过程的安全性。但是,如果未选择合适的采购方法,则可能会容易地破坏其他一些担忧,例如工厂和现场活动的协调,如果未选择合适的采购方法,则可能会很容易地破坏。例如,在预制混凝土结构中,预制成员需要高技能的工人,更复杂的技术和更复杂的设计。由于设计专业人士需要专注于完善模块化设计,因此强化行政工作可能会被忽视。为了在模块化建设方程中包括这些管理任务,本研究提出了对模块化和/或预先制造的系统的基本理解,并提出了一种基于项目类型的建筑采购方法,以满足这种短暂的来,实现可持续的模块化建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号