首页> 外文会议>International Conference on Sustainable Design, Engineering and Construction >A framework for Organizing a Resilient Cost Benefit Analysis for Construction Projects.
【24h】

A framework for Organizing a Resilient Cost Benefit Analysis for Construction Projects.

机译:组织建筑项目弹性成本效益分析的框架。

获取原文

摘要

Large public-investment construction projects require advanced decision support systems. The traditional (static) cost benefit analysis (CBA) is one of the early-phase decision support system in construction business. The purpose of this paper is to develop a resilient and dynamic CBA framework for road construction projects. The research systematically reviewed academic quality ensured and rigorous peer-reviewed articles (from web of science and publish or perish databases) and discuss selected Norwegian construction projects. The research identified some key attributes (e.g. resiliency, dynamics, system thinking) that the traditional CBA lacks and the framework developed integrates these attributes to fill the gap. The research has theoretical implication from the methodological improvement perspective (e.g. attempting to integrate complex attributes). The practical implication is to avoid inefficiencies and obtain better regulation in government policies. The results could be used on go/no go decision for the Norwegian Megaproject (E39 ferry-free coastal highway construction).
机译:大型公共投资建设项目需要先进的决策支持系统。传统(静态)成本效益分析(CBA)是施工业务中的早期决策支持系统之一。本文的目的是为道路建设项目开发弹性和动态CBA框架。该研究系统地审查了学术素质,确保和严格的同行评审文章(来自科学和发布或灭亡数据库的网络),并讨论了选定的挪威建筑项目。该研究确定了传统CBA缺陷和框架的一些关键属性(例如,弹性,动态,系统思维)开发了这些属性将这些属性集成以填补差距。该研究具有来自方法改进的观点的理论意义(例如,试图整合复杂属性)。实际含义是避免效率低下,从政府政策中获得更好的规定。结果可用于GO / NO决定挪威MEGAPROJECT(E39 Ferry沿海公路建设)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号