A Framework for Identifying Causal Factors of Delay in Nuclear Power Plant Projects

机译:识别核电站项目延迟因果因素的框架

获取原文

摘要

Nuclear power plant projects have unique characteristics (e.g., variability of projects portfolio, processes and procedures, security and safety requirements) that affect precise estimation of project schedule and cost. Inaccurate estimation may result in delay and cost overrun, and accordingly jeopardizing the nuclear power plant's operating license. To reliably estimate projects schedule and cost, the causal factors of delay in nuclear power plant projects need to be carefully investigated and analyzed. This study presents a framework for identifying causal factors of delay for operable nuclear power plants projects. This framework is designed in three main stages: (1) collecting data on projects that experienced delay for various reasons (e.g., missing schedule updates, design errors, scope change); (2) identifying the reasons for delay into standard common causal factors; and (3) analyzing the identified causal factors of delay and their impact on projects schedule and cost performance. This framework will assist decision-makers (e.g., nuclear project managers and project controllers) in identifying and evaluating the nuclear projects causal factors of delay to improve the reliability of projects schedule and cost estimation.
机译:核电厂项目具有独特的特性(例如,项目组合,流程和程序,保障和安全要求的变化)影响项目的进度和成本的精确估计。不准确的估计可能会导致延迟和成本超支,并相应地危及核电厂的运营许可证。为了可靠地估计项目进度和成本,在核电厂项目延迟的原因的因素需要仔细研究和分析。这项研究提出了识别延迟的原因的因素为可操作的核电厂项目的框架。该框架被设计成在三个主要阶段:(1)项目上收集数据,由于各种原因有经验的延迟(例如,丢失的日程表更新,设计错误,范围变更); (2)识别的原因延迟到标准的公共偶然因素; (3)分析延迟的识别偶然因素及其对项目的影响进度和成本的表现。这一框架将帮助决策者(例如,核项目经理和项目控制器)在识别和评估核项目的因果延迟的因素,以提高可靠性的项目进度和成本估算。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号