【24h】

The First 30 Years of RCC Dams

机译:前30年的RCC水坝

获取原文
获取外文期刊封面目录资料

摘要

In RCC1991 (in Beijing),the first of the RCC Dam Conferences,a paper was presented in association with the greatly-missed late Dr Shen Chonggang called" The Development of RCC Dams throughout the World".In RCC1995 (in Santander),a General Report was given on the "Expansion of RCC dams throughout the World and the Construction Methodologies being used".In RCC1999 (in Chengdu) a General paper was given titled " Latest Developments in RCC Dams".In RCC2003 (in Madrid),a Lecture was given called "The State-of-the-Art of RCC dams in 2003-an update of ICOLD Bulletin No.125".In RCC2007 (in Guiyang) another Lecture was given titled "Overview of RCC at the end of 2006" and in RCC2012 (in Zaragoza) a further Lecture was given on "New developments in RCC dams".This Paper is an extension and update of the above series of papers and traces the development of RCC dams over the past 30 years.During this period approaching 700 RCC dams have been completed,or are under construction,in more than 60 countries.These dams have been constructed in all types of conditions for all sorts of purposes and have essentially superseded traditional concrete dams.The paper describes how the types of RCC being used in dams has changed and developed over the years and the various new techniques that have been introduced.
机译:在RCC1991(北京),第一个RCC大坝会议,一篇论文与沉崇港博士呼吁“全世界RCC水坝的发展”相关联。在RCC1995(桑坦德),A关于“全世界RCC水坝的扩展以及正在使用的建设方法”的一般报告。在RCC1999(成都)一般纸上被赋予“RCC水坝的最新发展”。在RCC2003(马德里),a讲课被称为“2003年的RCC水坝最先进的武器 - 一个更新ICOLD公告No.125”。在RCC2007(在贵阳)(贵阳)另一项讲座“2006年底概述了RCC”在RCC2012(在Zaragoza)中,对“RCC水坝的新发展”进行了进一步的讲座。这篇论文是上述一系列论文的延伸和更新,并追溯到过去30年的rcc水坝的发展。这一时期接近700个RCC水坝已经完成,或正在建设中,超过60次计数RIES。这些大坝已经在各种目的中构建了各种各样的条件,并且具有基本上取代的传统混凝土坝。纸张描述了多年来的RCC类型的RCC类型如何变化和发展,以及各种新技术已经介绍过。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号