首页> 外文会议>ASME India International Oil and Gas Pipeline Conference >USING COMPLEMENTARY TECHNIQUES OF ICDA AND ILI FOR ASSESSING THE INTEGRITY OF AN OFFSHORE / ONSHORE SPM CRUDE PIPELINE
【24h】

USING COMPLEMENTARY TECHNIQUES OF ICDA AND ILI FOR ASSESSING THE INTEGRITY OF AN OFFSHORE / ONSHORE SPM CRUDE PIPELINE

机译:利用ICDA和ILI的补充技术来评估海上/陆上SPM原油管道的完整性

获取原文

摘要

When a single source based crude oil feeder 'difficult-to-pig' pipeline runs through a highly sensitive marine national park, the Operator is challenged with the dilemma of how to assure the integrity of the pipeline with the limited options that are available. After ten (10) years of service, in 2015, an Indian Operator chose to assess the time dependent threat of internal corrosion on their difficult-to-pig offshore (SPM) to onshore (Tank Farm) crude oil pipeline by utilizing the NACE SP0208-2008 Standard for Liquid-Petroleum Internal Corrosion Direct Assessment (ICDA). This methodology was already recommended by ASME B31.8S as one (1) of the three (3) options for assessing integrity of a pipeline. Only a year earlier, in 2014 - the Indian regulators, Oil Industry Safety Directorate (OISD) had also brought the technique of ICDA within its regulatory framework for Operators as a credible option to assess integrity of pipelines that are difficult to pig and/or un-piggable. This paper discusses on the findings of the ICDA program that forced the Operator to accelerate their integrity program for the subject pipeline and perform specialised In-line Inspection (ILI) in 2018. The paper also compares the results obtained from the non-intrusive predictive based ICDA program Vs. the ILI measured data. This paper will be useful for Operators to understand the complementary nature of ICDA with ILI and provide guidance on how combination of these two (2) pipeline integrity tools not only identify the locations at which internal corrosion activity has already occurred but also answers the questions on why it occurred and how would it be mitigated? The Operator managed to assure the integrity of their "difficult-to-pig" pipeline by timely utilisation of the integrity validation tools of ICDA and ILI. By doing this they were able to prevent the occurrence of any catastrophe that may result in an environmental, and subsequently an economic disaster.
机译:当一个基于单个来源的原油饲养者的难以通过高度敏感的海域国家公园运行时,运营商受到如何保证管道完整性的困境,审查是困境。经过十(10)多年的服务后,2015年,印度操作员选择通过利用NACE SP0208评估内部腐蚀的时间依赖威胁,以便通过使用NACE SP0208来评估对船舶近海(SPM)的内部腐蚀的时间依赖性威胁到陆上(坦克农场)原油管道-2008液体 - 石油内部腐蚀直接评估标准(ICDA)。该方法已被ASME B31.8S作为三(3)个选项的一(1)项,用于评估管道完整性。 2014年,唯一一年,2014年 - 印度监管机构,石油行业安全局(OISD)还将ICDA的技术带入了其监管框架内,作为难以评估难以养猪和/或联合国难以的管道的完整性的可靠选择 - 可行的。本文讨论了ICDA计划的调查结果,该计划迫使运营商加速他们的主题管道的完整性计划,并在2018年进行专业的在线检查(ILI)。本文还比较了从非侵入性预测性获得的结果ICDA计划与ILI测量数据。本文将有助于了解ILI的ICDA的互补性质,并提供关于这两种(2)管道完整性工具的结合的指导不仅识别内部腐蚀活动已经发生的位置,而且还回答问题为什么它发生了,如何减轻?操作员通过及时利用ICDA和ILI的完整性验证工具来确保其“难以播放”管道的完整性。通过这样做,他们能够防止任何可能导致环境的灾难的发生,随后是经济灾难。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号