(p407) Time management at the BOF meltshop 2 of ThyssenKrupp Steel Europe AG in Duisburg Beeckerwerth

机译:(p407)杜伊斯堡北堡北斯坦克钢铁欧洲钢铁欧洲钢铁欧洲北部埃斯堡埃斯堡欧洲北部的时间管理

获取原文

摘要

The BOF meltshop 2 of ThyssenKrupp Steel Europe AG in Duisburg Beeckerwerth has a capacity of almost 6million mtpy at an average melt weight of 265 tons. Crude steel is produced with three converters and casted viatwo continuous casters. With respect to steel grades the sequences are produced in composite, so that especiallycontinuous caster 2 is able to cast without any setup time for more than 24 hours. The requested chemical analysisand temperatures are reached after tapping via several secondary metallurgy treatments.For production process' time management, a three-level planning system is used: First, the order of sequences toproduce is established for each continuous caster for up to 48 hours. Subsequently, the meltshop 2 planning tool isused for detailed planning until the end of the following shift. This tool is based on the software ODMS(Optimization Decision Management System) by IBM; hence, a (mixed integer) linear program is solved usingCPLEX. The weights in the combined objective function are influenced by the user by choosing the appropriateconfiguration. Further possibilities of interaction are offered by a graphical user interface in form of a Gantt chart. Aprovable optimal solution is found within 20 seconds. Finally the production process is monitored via the traffic lighttool: In order to determine whether the meltshop 2 planning tool result is still feasible, it is compared every tenseconds to the actual state in the BOF meltshop and at the continuous casters.Planning and traffic light tool have been put into operation in March 2012. Since then, the turn-round times havedecreased by 10% on comparable basis. Further advantages are a better usability of maintenance and downtimeperiods, an optimisation of required number of casting ladles and an increased predictability of production capacityin dependency of the casting programme.
机译:Duissenkrupp钢铁欧盟2号BOF Meltshop 2在杜伊斯堡贝克韦尔蒂的能力近600万吨,平均熔体重量为265吨。用三个转换器和铸造的Viatwo连续脚轮生产粗钢。关于钢等级,序列在复合材料中产生,使得尤其能够在没有任何设置时间的情况下浇铸超过24小时。通过多次次级冶金治疗攻丝后达到所要求的化学分析和温度。生产过程的时间管理,使用三级规划系统:首先,为每个连续施法者建立序列追踪顺序,最长可达48小时。随后,熔体商店2规划工具用于详细规划,直到下降结束。该工具基于IBM的软件ODMS(优化决策管理系统);因此,使用(混合整数)线性程序使用复合。组合目标函数中的重量受到用户通过选择适当配置的影响。通过甘特图的形式提供交互的进一步可能性。在20秒内找到可靠的最佳解决方案。最后,通过交通灯电池监测生产过程:为了确定熔体2规划工具结果是否仍然可行,将每一个三十秒和钢熔融商店和连续脚轮的实际状态进行比较。持续的脚轮和交通灯工具已于2012年3月投入运营。从那时起,转向次数以可比的方式获得了10%。进一步的优点是维护和下端精神器的可用性,优化所需数量的铸造钢包和增加的铸造程序的生产能力的可预测性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号