首页> 外文会议>European Steel Technology Application Days >(p395) Commissioning of two complete sets of Coke Oven Machines during the start-up of a new Coke Making Complex.
【24h】

(p395) Commissioning of two complete sets of Coke Oven Machines during the start-up of a new Coke Making Complex.

机译:(P395)在新的焦炭制作复合物的启动期间调试两组成套焦炉机。

获取原文

摘要

Present paper will describe the main steps usually performed during erection, commissioning and final tests for thetwo full sets of machines relevant to a green field Coke Making plant.As an example will be used the project recently realized in Indonesia for P.T. Krakatau POSCO in cooperationbetween Schalker Eisenhütte Maschinenfabrik GmbH as machines supplier and Paul Wurth Italia S.p.A. as CokeOven Batteries technological supplier.A short explanation of the plant will introduce the contest in which the above activities have been performed, somedata relevant to the machines will be given in order to explain their configuration, the step by step description of thevarious phases will explain the workflow adopted.
机译:本文将描述通常在与绿地焦炭制作工厂相关的勃起,调试和最终测试期间进行的主要步骤,调试和最终测试。作为一个例子,将使用最近在印度尼西亚实现的项目为P.T. Krakatau Posco在ScharkerEisenhütteMaschinenfabrik GmbH作为Coplines供应商和Paul Wurth Italia Spa作为可焦电池技术供应商。将植物的简短解释介绍了上述活动的比赛,将给出与机器相关的上述活动。为了解释他们的配置,逐步描述了阶段的描述将解释所采用的工作流程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号