Potential Significant Payoffs; Development cycle time; Production part cost (includes part fabrication and support costs); Enables; Simpler fabrication for existing systems (reduced part count); Potential revolutionary new designs; Achieving Full Potential Requires; Addressing AM-unique material and process considerations; Sustained effort on alloy, processing, properties and function throughout development; Variability assessment and application in design margins; Risk-based approaches to system level qualification; Customer Adoption and Requirement Considerations.
展开▼