Fixed Plant Facility Siting - A Mega Project Lifecycle Framework

机译:固定工厂设施选址 - 巨型项目生命周期框架

获取原文

摘要

Facility Siting based on tools such as Consequence Analysis (CA) and Quantitative Risk Assessment (QRA) is often times successfully applied for Brownfield operating unit projects, projects with relatively smaller footprints and for projects lasting relatively short time-periods. Challenge remains to apply and realize the full potential and value of Facility Siting for Mega-Projects. This is mostly due to project complexity and length - this paper will introduce a Management Framework to successfully apply CA and QRA as part of Facility Siting for Mega-Projects. The paper will also outline key strategies to ensure successful (i.e. value adding) implementation of facility siting, suggest a list of activities, associated sequence and pitfalls to avoid. Project Management team (e.g. Project Sponsor, Project Engineers, Managers) of both owner/operator and contractor/vendor may find this paper more useful as it provides a broad overview (i.e. when to initiate, how to plan, execute and close such assignment to maximize value) including real life examples of facility siting process over the project lifecycle.
机译:基于后果分析(CA)和定量风险评估(QRA)的工厂选址通常是成功应用于Brownfield操作单元项目的时间,具有相对较小的占用空间和项目持续相对较短的时间段的项目。挑战仍然适用,实现了大型项目设施的全部潜力和价值。这主要是由于项目复杂性和长度 - 本文将引入管理框架,以成功应用CA和QRA作为设施选址的兆瓦项目的一部分。本文还将概述重点策略,以确保成功(即价值添加)设施选址的执行,建议避免活动,相关序列和陷阱的活动清单。所有者/运营商和承包商/供应商的项目管理团队(例如项目赞助商,项目工程师,经理)可能会发现本文更有用,因为它提供了广泛的概览(即何时启动,如何计划,执行和关闭此类分配最大化值)包括项目生命周期内设施选址过程的现实生活示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号