首页> 外文会议>POWER-GEN International Conference and Exhibition >Overview Presentation and Challenges of the Duke Energy Cliffside Modernization Project Unit 5 Wet Flue Gas Desulfurization and new 800 MW Supercritical Pulverized Coal Unit 6 Addition Project
【24h】

Overview Presentation and Challenges of the Duke Energy Cliffside Modernization Project Unit 5 Wet Flue Gas Desulfurization and new 800 MW Supercritical Pulverized Coal Unit 6 Addition Project

机译:概述公爵能源克利夫赛德现代化项目单元5湿烟气脱硫和新型800 MW超临界粉煤煤单元6加成项目

获取原文

摘要

The Cliffside Modernization Project is a major project undertaken for Duke Energy to retire older coal units, clean up flue gas emissions from an existing unit, and add a large new generating unit at the Cliffside Steam Station. The purpose of this paper is to: Provide an overview of the project. Discuss challenges unique to the project. Highlight the partnership between Duke Energy and Shaw.
机译:Cliffside现代化项目是为公爵能源进行的主要项目,退休,退出旧煤炭单位,清理现有单位的烟气排放,并在Cliffside蒸汽站中添加一个大型新型发电机。 本文的目的是:提供项目的概述。 讨论项目独有的挑战。 突出公爵能源和肖之间的伙伴关系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号