首页> 外文会议>POWER-GEN International Conference and Exhibition >Opportunities and Challenges for Investment in Clean Energy Pakistan's Power Sector(PPT)
【24h】

Opportunities and Challenges for Investment in Clean Energy Pakistan's Power Sector(PPT)

机译:清洁能源巴基斯坦电力部门投资的机遇与挑战(PPT)

获取原文

摘要

1. Since 2009, the US Government has committed over $6 billion to Pakistan Economy: 1.1 To address crippling energy challenges; foster economic growth, improve education and healthcare, and support domestic stabilization 2. USAID has committed over $1 billion to Pakistan energy helping: 2.1 Construct and/or retrofit Mangla, Tarbela, Satpara, Gomal Zam, Kaitu Weir, and a run of the river hydro electric plant and partly rehabilitate Jamshoro, Muzzafergarh, and Guddu thermal plants 2.2 Reduce losses, improve collections and improve the profitability and performance of nine distribution companies 2.3 Fund transmission lines connecting private projects to the grid 2.4 Improve energy sector policy and regulatory governance 3. USAID support has: 3.1 Added about 1,600 megawatts (MW) to the Pakistan national grid 3.2 Increased revenues at electricity distribution companies by $360 million 3.3 Improved electricity service to over 17 million Pakistanis.
机译:1.自2009年以来,美国政府已致力于巴基斯坦经济超过60亿美元:1.1以满足瘫痪的能源挑战;促进经济增长,改善教育和医疗保健,支持国内稳定2. USAID致力于巴基斯坦能源有帮助:2.1构建和/或改造Mangla,Tarbela,Satpara,Gomal Zam,Kaitu Weir以及河流水电厂和部分恢复贾姆斯多洛,Muzzafergarh和Guddu热电厂2.2减少损失,改善收集,提高九个配送公司的盈利能力和性能2.3资金传输线将私人项目连接到电网2.4改善能源部门政策和监管治理3。 USAID支持有:3.1增加了大约1,600兆瓦(MW)到巴基斯坦国家电网3.2电力分销公司的收入增加3.3亿美元3.3升至超过1700万巴基斯坦的电力服务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号