【24h】

Catchment multisite discharge measurements for hydrological model calibration

机译:用于水文模型校准的集水器多销放电测量

获取原文

摘要

This work has the objective to find and test methodologies for distributed hydrological model calibration starting from discharge measurements. As all distributed models, also FEST-WB demands a large amount of information and parameters. To reduce the calibration effort, in this study we assign a first initial distribution of values for each parameter starting from information about soil type and usage and we let calibration change only the mean value, through a correction factor. The study area in which this methodology has been applied is Piemonte, with a total of 50 flow measurements series. With this large amount of discharge data it is possible to test a multi-site calibration approach. The results show that the use of only one measure for calibration highlight some shortcomings in the validation results, while the use of all the measures together improve model performance in all catchments levels.
机译:这项工作有目的是从放电测量开始,找到和测试分布式水文模型校准的方法。作为所有分布式模型,SEST-WB也要求大量的信息和参数。为了减少校准工作,在本研究中,我们为从关于土壤类型和用法的信息开始为每个参数分配的第一个初始分布,并且我们通过校正因子来校准改变平均值。应用该方法的研究区是Piemonte,总共50个流量测量系列。通过这种大量的放电数据,可以测试多站点校准方法。结果表明,使用只有一个校准措施突出了验证结果中的一些缺点,而所有措施的使用在一起改善了所有集水区水平的模型性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号