The Total Exploration and Production Nigeria Limited has been operating its first discovered field in Nigeria for more than 40 years as an oil dominated field but the future potential of the field is gas. Hence, the decision to upgrade the field to harness the gas potential as well as achieving the national priorities of flare down and gas supply to the domestic market. After several studies and evaluation of various options, it was decided to carry out the upgrade in Simultaneous Operations (SIMOPS) mode. The upgrade involved triple SIMOPS of oil and gas production, drilling in a gas well cluster and heavy construction (Upgrade Projects). This SIMOPS is uncharacteristically complex with the following elements; more than 3 years non-stop activities, more than 6 million man-hours, more than 4,000 people working together out of which more than 80% are semiskilled and unskilled local community personnel; involvement of consortium of 3 contractors who have never worked together in the past, more than 15 major subcontractors, unknown underground conditions of the installations, aging facility with assets integrity challenges, over 2000 lifting of loads above high pressure live-lines, large number of thermal engines (mobile and stationary) and other ignition sources in hazardous zones and so on. The Company (Project management team and Production team) together with the contractors jointly put together some well thought out Safety initiatives to contain the identified risks. Some of these initiative include; effective risk assessment mechanism, strict control of ignition sources and looping the ignition engine Emergency Shut-Down (ESD) to the plant ESD, drop object study and crash test of protective barrier built across high pressure live-lines, sectionalization of SIMOPS zones, joint project and production emergency drills, technical and HSE competence development to mention but a few. More than 24 million contractors’ man-hours achieved and about 6 million man-hours remaining with a lot of challenges that the project has encountered. This paper will present in detail what the company implemented to achieve HSE results such as Total Recordable Injury Rate (TRIR) of 0.37 and Lost Time Injury Frequency (LTIF) of 0.10.
机译:尼日利亚有限公司的全面勘探和产量均为尼日利亚首次发现了40多年,占油的领域,但该领域的未来潜力是天然气。因此,决定升级现场以利用气体潜力,实现耀斑的国家优先事项和对国内市场的气体供应。经过几项研究和评估各种选择,决定在同时操作(SIMOPS)模式下进行升级。升级涉及石油和天然气生产的三倍SIMOPS,钻井煤气井簇和沉重的建筑(升级项目)。此Simops与以下元素无论如何复杂;超过3年的不间断活动,超过600万人,超过4000人在一起,其中超过80%的人是半熟练和非熟练的本地社区人员; 3个承包商联盟的参与从未在过去一起工作过,超过15个主要的分包商,未知的地下条件,衰老设施与资产诚信挑战,超过2000升负载高压直线,大量危险区域的热动发动机(移动和静止)和其他点火源等。公司(项目管理团队和生产团队)与承包商共同放在一起考虑安全措施,以遏制识别的风险。其中一些举措包括;有效的风险评估机制,严格控制点火源,并将点火发动机紧急关闭(ESD)对植物ESD,滴眼液研究和碰撞试验,防护屏障构建在高压直线上,Simops区的划分,关节项目和生产应急钻,技术和HSE能力发展提及,但几个。超过2400万承包商的人数,达到了大约600万的人 - 小时仍然存在该项目遇到的大量挑战。本文将详细介绍,公司实施以实现HSE结果,例如总可录制损伤率(TRIR)0.37,损失的时间损伤频率(LTIF)为0.10。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号