Risk Management in Biomass Power Plants Using Fuel Switching Flexibility

机译:使用燃料切换灵活性的生物质发电厂的风险管理

获取原文
获取外文期刊封面目录资料

摘要

Thailand's energy consumption from alternative sources continues to increase in recent years. This is largely due to the Thai government's policy in promoting alternative energy development in all sectors, especially in biomass energy which accounts for a significant share of the total amount of alternative energy. Moreover, over the next 20 years, Thailand wants to double the amount of energy from biomass sources from 2,812 MW to 5,570 MW by 2035. In order to meet this ambitious target, the Thai government provides financial incentives through a program called Feed-in-Tariff so as to attract private developers to implement alternative energy projects. As for biomass power plants, however, a major risk is an input biomass price, which can be fluctuated according to season and availability in the area where the project is located. This paper is therefore to present a method that can help mitigate the risks stemming from biomass price fluctuation using a flexible design called "Fuel Switching Flexibility (FSF)". The FSF is a design concept that takes advantage the notion that fuels for biomass projects can be from several sources. Then, project managers have the option to select the appropriate sources of input materials for the energy production of the project. Valuing the biomass power plants embedded with the FSF can be done with real option analysis. The results of the study showed that projects with FSF have increased in its financial values, without the help of government in handing the financial subsidy. However, the project with only the FSF may, during a certain period, still face financial difficulty, and this is why the government subsidy is still needed for alternative energy projects like biomass power plants.
机译:泰国从替代来源的能源消耗近年来持续增加。这主要是由于泰国政府在促进所有部门的替代能源发展方面的政策,特别是在生物质能能源中,占替代能源总额的大量份额。此外,在未来的20年中,泰国是要到2035年生物质资源的能源量从2812兆瓦增加一倍,达到5570万千瓦。为了满足这一宏伟目标,泰国政府通过提供一个程序叫进-IN-财政奖励关税以吸引私人开发商实施替代能源项目。然而,对于生物质发电厂,主要风险是输入生物质价格,这可以根据项目所在地区的季节和可用性波动。因此,本文介绍了一种方法,可以帮助减轻使用称为“燃料切换灵活性(FSF)”的柔性设计来减轻生物质价格波动的风险。 FSF是一个设计理念,利用了生物量项目燃料的概念可以来自多个来源。然后,项目经理可以选择选择项目的能源生产的适当输入材料来源。嵌入FSF的生物质发电厂可以通过实际选择分析来完成。该研究的结果表明,在援助财政补贴方面,在没有政府的帮助下,有FSF的项目的资金价值观增加。然而,只有FSF的项目可能在一定时期内,仍然面临财务困难,这就是为什么政府补贴仍然需要生物质发电厂等替代能源项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号